Analisis Tenaga Kerja dalam Meningkatkan Produktivitas Pekerjaan pada Pembangunan Perumahan Palm Vista Residence

Authors

  • Naimatul Fikriyah Universitas Islam Sultan Agung
  • Kartono Wibowo Universitas Islam Sultan Agung
  • Abdul Rochim Universitas Islam Sultan Agung

DOI:

https://doi.org/10.55606/jurritek.v5i1.8246

Keywords:

AHP, Construction Project, Labor Productivity, LUR, Work Sampling

Abstract

Labor productivity is a critical factor in construction project success as it directly affects time, cost, and work quality. In the Palm Vista Residence housing development project, delays in ground floor structural works indicate suboptimal human resource performance. This study aims to analyze labor productivity levels, identify factors influencing productivity, and formulate strategies to improve productivity in sloof beams, columns, and floor slab works. The research employs a quantitative approach with descriptive-analytical methods through field observations, questionnaires, and interviews. Labor productivity is measured using the work sampling method and the Labour Utilization Rate (LUR), while influencing factors are analyzed using multiple linear regression. Strategy prioritization for productivity improvement is determined using the Analytical Hierarchy Process (AHP). The results show that labor productivity is at a moderate level and is significantly influenced by work experience, managerial aspects, and coordination and planning. The priority strategies include improving worker competence and strengthening project management practices. These findings are expected to provide practical guidance for construction labor management to enhance efficiency and ensure timely project completion.

Downloads

Download data is not yet available.

References

Abudullah, Y., Usman, S. D., & Tuloli, M. Y. (2025). Analisis perbandingan produktivitas tenaga kerja terhadap analisa harga satuan pekerjaan (AHSP) SNI 2024 dan analisa di lapangan. Jurnal Ilmiah Multidisiplin, 4(2), 1–9. https://doi.org/10.54923/researchreview.v4i2.252

Angelica, N. P., & Puspasari, V. H. (2024). Kajian faktor-faktor yang mempengaruhi produktivitas tenaga kerja proyek konstruksi. Jurnal Basement, 2(1), 37–44. https://doi.org/10.36873/basement.v2i1.12757

Desfita, M., & Hamid, F. (2021). Work sampling methods dalam analisis produktivitas tenaga kerja konstruksi proyek pembangunan gedung (Studi kasus: Proyek pembangunan gedung kuliah Baiturrahmah). Jurnal Teknologi dan Sistem Informasi Bisnis, 3(1), 259–266. https://doi.org/10.47233/jteksis.v3i1.223

Fadillah, N. L., & Dita, I. N. P. P. (2024). Analysis of labor productivity on lightweight brick work using the work sampling method. Composite: Journal of Civil Engineering, 3(2), 1–12. https://doi.org/10.26905/cjce.v3i2.13097

Faradina, M. P., & Dewi, S. H. (2022). Analisis produktivitas tenaga kerja pekerjaan pembesian dan bekisting serta faktor-faktor yang mempengaruhinya. Jurnal Saintis, 22(2), 59–68. https://doi.org/10.25299/saintis.2022.vol22(02).25190

Jian, F., Liu, Q., Feng, C., Hu, Q., Yu, Q., & Guo, Q. (2025). Critical factors affecting construction labor productivity: A systematic review and meta-analysis. Buildings, 15(1), 1–23. https://doi.org/10.3390/buildings15142463

Krishnan, B. (2022). Analysis of labour productivity in construction industry using analytical hierarchy process and linear regression method. International Journal for Research in Applied Science and Engineering Technology, 10, 1770–1776. https://doi.org/10.22214/ijraset.2022.45365

Muslim, I., Zainuri, & Lubis, F. (2019). Analisis produktivitas tenaga kerja pada pekerjaan dinding facade (Studi kasus pada proyek pembangunan Hotel POP Pekanbaru). Siklus: Jurnal Teknik Sipil, 5(1), 12–22. https://doi.org/10.31849/siklus.v5i1.2388

Nurhendi, R. N., & Bastam, M. N. (2024). Analisis produktivitas tenaga kerja konstruksi dengan pendekatan relative importance index (RII). Jurnal Deformasi, 9(2), 167–177. https://doi.org/10.31851/deformasi.v9i2.17136

Pawiro, S., Tjakra, J., & Arsjad, T. T. (2015). Optimalisasi produktivitas tenaga kerja dalam proyek konstruksi (Studi kasus: Pembangunan Gedung Mantos Tahap III). Jurnal Tekno Sipil, 13(62), 1–6. https://doi.org/10.35793/jts.v13i62.8192

Pradhana, R. D., Trianto, A., & Fansuri, M. H. (2025). Factors affecting labor productivity in the construction sector: A literature review. Journal of Civil Engineering and Planning, 6(1), 1–15. https://doi.org/10.37253/jcep.v6i1.10288

Prakoso, S. H. (2024). Analisis produktivitas tenaga kerja proyek konstruksi pekerjaan shear wall dengan metode work sampling. Jurnal Go Infotech, 30(1), 96–104. https://doi.org/10.36309/goi.v30i1.264

Rini, I. (2019). Pengaruh produktivitas tenaga kerja terhadap kinerja waktu proyek pada bangunan bertingkat. Jurnal Infrastruktur, 3, 127–135. https://doi.org/10.35814/infrastruktur.v3i2.715

Sujana, C. M., & Hakim, R. A. (2021). Perbandingan produktivitas tenaga kerja pembesian dan bekisting saat jam kerja normal dan lembur menggunakan metode productivity rating. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), 4(September), 145–152.

Susanti, D. D., Supriani, F., & Misliniyati, R. (2025). Comparative analysis of labour plastering time on labour productivity with work sampling method. Jurnal Pensil: Pendidikan Teknik Sipil, 14(2), 316–330. https://doi.org/10.21009/jpensil.v14i2.54314

Thenu, G., Taihuttu, F., & Kempa, M. (2019). Analisis produktivitas pekerja konstruksi pada pekerjaan beton bertulang. Jurnal Simetrik, 9(2), 220–225. https://doi.org/10.31959/js.v9i2.369

Tukan, Y. K. B., Kurniawan, R. B., & Susanti, D. A. (2023). Analisis faktor-faktor yang mempengaruhi produktivitas karyawan dengan metode work sampling dan regresi linear berganda di PT Graha Nusa Pratama. Al-Kharaj: Jurnal Ekonomi, Keuangan & Bisnis Syariah, 5(6), 3094–3103. https://doi.org/10.47467/alkharaj.v5i6.2901

Walangitan, R. (2012). Produktivitas tenaga kerja dengan menggunakan metode work sampling pada pekerjaan kolom dan balok Mega Trade Center Manado. Tekno-Sipil, 10(57), 14–20. https://doi.org/10.35793/jts.v10i57.4312

Wibowo, K. D., & Prasetya, A. (2004). Analisa produktivitas pekerja dengan metode work sampling: Studi kasus pada proyek X dan Y. Civil Engineering Dimension, 6(2), 72–79. https://doi.org/10.9744/ced.6.2.72-79

Yanti, G. (2017). Produktivitas tenaga kerja dengan metode work sampling. Jurnal Teknik Sipil Siklus, 3(2), 100–106. https://doi.org/10.31849/siklus.v3i2.385

Yunita, A., & Hidayat, B. (2024). Perbandingan produktivitas tenaga kerja proyek konstruksi pada jam kerja normal. Jurnal Bangunan, Konstruksi & Desain, 2(3), 180–190. https://doi.org/10.25077/jbkd.2.3.180-190.2024

Yusuf, M. R., Utiarahman, A., & Sumaga, A. U. (2025). Analisis produktivitas tenaga kerja menggunakan work sampling pada pekerjaan kolom dalam proyek konstruksi. Jurnal Ilmiah Multidisiplin, 4(2), 1–13. https://doi.org/10.54923/researchreview.v4i2.229

Zakyahutami, F. R., Abduh, M. N., & Mulyani, S. P. (2025). Analisis produktivitas tenaga kerja perhitungan lapangan pada konstruksi bangunan gedung (Studi kasus pembangunan Mall Pelayanan Publik Kabupaten Gowa, Sulawesi Selatan). Jurnal Penelitian Teknik Sipil Konsolidasi, 3(2), 140–148. https://doi.org/10.56326/jptsk.v3i2.4699

Downloads

Published

2026-01-28

How to Cite

Naimatul Fikriyah, Kartono Wibowo, & Abdul Rochim. (2026). Analisis Tenaga Kerja dalam Meningkatkan Produktivitas Pekerjaan pada Pembangunan Perumahan Palm Vista Residence. JURAL RISET RUMPUN ILMU TEKNIK, 5(1), 718–735. https://doi.org/10.55606/jurritek.v5i1.8246

Similar Articles

1 2 3 4 5 6 7 > >> 

You may also start an advanced similarity search for this article.