Penerapan BIM dalam Perhitungan Volume Pekerjaan dan Biaya Konstruksi Menggunakan Software Autodesk Revit pada Proyek Gedung Pengadilan Agama Sungai Raya

Authors

  • Muhammad Naufal Habibbullah Universitas Tanjungpura
  • Lusiana Lusiana Universitas Tanjungpura
  • Rafie Rafie Universitas Tanjungpura

DOI:

https://doi.org/10.55606/jurritek.v5i1.7603

Keywords:

Autodesk Revit, BIM, BoQ, Construction Cost, Work Volume

Abstract

The calculation of work volume and construction costs is a fundamental aspect of project management, as errors in the estimation process can directly affect the preparation of the project budget. Many projects still use conventional methods for estimation, which are based on 2D working drawings with the assistance of Microsoft Excel, as seen in the Sungai Raya Religious Court Building project. This method is considered prone to calculation errors and less efficient due to the considerable amount of time required. With the advancement of technology, Building Information Modeling (BIM) has emerged, enabling automatic and integrated calculation of work volumes and construction costs through a three-dimensional digital model. This study aims to examine the implementation of BIM in the Sungai Raya Religious Court Building project and to compare the results of work volume and construction cost calculations between the BIM method using Autodesk Revit and the conventional method based on the project’s Bill of Quantity (BoQ). The research method was conducted by modeling the structural elements of the building, including pile caps, tie beams, columns, beams, floor slabs, and reinforcements. The results of work volume and construction cost calculations obtained from Autodesk Revit were then compared with the project’s BoQ as the conventional method. Based on the analysis, an average difference of 6.3% in work volume and 5.6% in construction cost was found, with the Autodesk Revit calculations showing slightly lower values compared to the project’s BoQ.

Downloads

Download data is not yet available.

References

Abadiyah, S., Rosyati, R., & Nurjanah, Q. (2021). Produktivitas tenaga kerja terhadap biaya dan waktu pelaksanaan pada pembangunan ruko 2 lantai. Structure, 3(2), 148. https://doi.org/10.31000/civil.v3i2.7165

Abbas, E. F., & Al-Zwainy, F. (2024). Diagnostic and identify the reasons for duration deviation in school buildings projects using root cause analysis technique. In AIP Conference Proceedings (Vol. 3097). AIP Publishing. https://doi.org/10.1063/5.0209893

Adhi, R. P., Hidayat, A., & Nugroho, H. (2016). Perbandingan efisiensi waktu, biaya, dan sumber daya manusia antara metode building information modelling (BIM) dan konvensional (studi kasus: perencanaan gedung 20 lantai). Jurnal Karya Teknik Sipil, 5(2), 220-229.

Al-Yami, A., & Sanni-Anibire, M. O. (2019). BIM in the Saudi Arabian construction industry: State of the art, benefit and barriers. International Journal of Building Pathology and Adaptation, 39(1), 33-47. https://doi.org/10.1108/IJBPA-08-2018-0065

Anjani, A., Bayzoni, B., Husni, H. R., & Niken, C. (2022). Penerapan building information modeling (BIM) menggunakan software Autodesk Revit pada gedung 4 rumah sakit pendidikan peguruan tinggi negeri (RSPTN) Universitas Lampung. Jurnal Rekayasa Sipil Dan Desain, 10(1), 486228. https://doi.org/10.23960/jrsdd.v10i1.2360

Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11, 241-252. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000127

Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241-252. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000127

Brunner, I. P. W. T., & Dhipawardana, M. D. (2011). Pengaruh perhitungan volume pekerjaan terhadap margin profit sebagai acuan penentuan harga satuan pekerjaan, studi kasus pada pekerjaan Rs. Boromeus Bandung. Jurnal Arsitektur Universitas Bandar Lampung.

Eastman, C. M. (2008). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers, and contractors. Wiley. https://doi.org/10.1002/9780470261309

Forcael, E., Ferrari, I., Opazo-Vega, A., & Pulido-Arcas, J. A. (2020). Construction 4.0: A literature review. Sustainability, 12(22), 9755. https://doi.org/10.3390/su12229755

Hafizhah, J., Kusuma Respati Aji, F., Heston, Y. P., & Abda, J. (2024). Penerapan BIM untuk perbandingan volume dan biaya konstruksi tangga darurat gedung Anex proyek pembangunan kompleks perantaraan pasar baru. Jurnal Inovasi Konstruksi, 3(1), 26-34. https://doi.org/10.56911/jik.v3i1.67

Hendrickson, C. (1998). Project management for construction. Carnegie Mellon University.

Jumas, D., & Tela, N. (2017). Analisa kebutuhan standardisasi pengukuran kuantitas (standard method of measurement) pada industri konstruksi di Indonesia. Jurnal Rekayasa, 7(1), 16-26.

Kirby, L., Krygiel, E., & Kim, M. (2017). Mastering Autodesk Revit 2018. John Wiley & Sons.

Laily, F. N., Husni, H. R., & Bayzoni, B. (2021). Perbandingan perhitungan BoQ dengan menggunakan Revit 2019 terhadap perhitungan BoQ dengan menggunakan metode konvensional pada pekerjaan struktur (studi kasus: Gedung G Fakultas Pertanian Universitas Lampung). REKAYASA: Jurnal Ilmiah Fakultas Teknik Universitas Lampung, 25(2), 27-31. https://doi.org/10.23960/rekrjits.v25i2.30

Mahyuddin, R., Rachim, F., Erdawaty, M., Pandarangga, A. P., Ulfiyati, Y., Sidiq, R., & Rosytha, A. (2023). Manajemen proyek konstruksi. Yayasan Kita Menulis.

Nur Dhou, Y., Susanto, A., & Yani, J. A. (2023). Prosiding Seminar Nasional Teknik Sipil 2023: ANALISIS PERBANDINGAN PERHITUNGAN METODE KONVENSIONAL DAN BUILDING INFORMATION MODELLING (BIM) TERHADAP VOLUME SERTA BIAYA PEKERJAAN KONSTRUKSI.

Sangadji, S., Kristiawan, S. A., & Saputra, I. K. (2019). Pengaplikasian building information modeling (BIM) dalam desain bangunan gedung. Matriks Teknik Sipil, 7(4). https://doi.org/10.20961/mateksi.v7i4.38475

Sidik, D. M., Handayani, N. K., & Noer, F. (2023). Analisis perbandingan volume beton dan besi tulangan pada struktur gedung 10 lantai di Kota Bandar Lampung antara metode konvensional dan building information modeling (BIM) Autodesk Revit. In Prosiding Seminar Nasional Teknik Sipil UMS (pp. 591-597).

Wahyudi, B. H., Peli, M., & Zaitul, Z. (2025). Faktor-faktor yang mempengaruhi tingkat akurasi perkiraan biaya pada tahap konstruksi gedung di Pemerintahan Kota Sungai Penuh. Jurnal Talenta Sipil, 8(2), 744. https://doi.org/10.33087/talentasipil.v8i2.884

Downloads

Published

2026-01-03

How to Cite

Muhammad Naufal Habibbullah, Lusiana Lusiana, & Rafie Rafie. (2026). Penerapan BIM dalam Perhitungan Volume Pekerjaan dan Biaya Konstruksi Menggunakan Software Autodesk Revit pada Proyek Gedung Pengadilan Agama Sungai Raya. JURAL RISET RUMPUN ILMU TEKNIK, 5(1), 354–365. https://doi.org/10.55606/jurritek.v5i1.7603

Similar Articles

1 2 3 4 5 6 7 8 > >> 

You may also start an advanced similarity search for this article.