Rekayasa Ulang Metode Pekerjaan Pengecoran dan Bekisting untuk Meningkatkan Kinerja Waktu dan Biaya Proyek Gedung Bertingkat
DOI:
https://doi.org/10.55606/jurritek.v5i2.8363Keywords:
Concrete Casting, Construction Duration, Formwork, Project Cost, Re-EngineeringAbstract
Time delays and cost overruns remain major problems in building construction projects, particularly in concrete structural works that dominate project duration and cost. This study aims to evaluate the application of re-engineering in concrete structural work methods on the time and cost performance of multi-storey building projects. A quantitative approach using a case study method was employed through comparative analysis between the existing method and alternative methods. The analyzed alternatives include ready-mix concrete with Sika Viscocrete 8007 admixture and semi-system formwork as Alternative I, ready-mix concrete with system formwork as Alternative II, and ready-mix concrete with Sika Viscocrete 8007 admixture combined with system formwork as Alternative III. The results show that all alternatives perform better than the existing method with a duration of 243 days. Alternative I reduced the duration to 208 days with cost efficiency of IDR 55,781,730 or 0.214 percent. Alternative II reduced the duration to 203 days with cost efficiency of IDR 187,553,261 or 0.724 percent. Alternative III achieved the best performance with a duration of 168 days, accelerating 75 days and providing the highest cost efficiency of IDR 243,334,991 or 0.941 percent. The study concludes that re-engineering effectively improves project time and cost performance, with Alternative III as the optimal method.
Downloads
References
Alshihri, S., Al-Gahtani, K., & Almohsen, A. (2022). Risk factors that lead to time and cost overruns of building projects in Saudi Arabia. Buildings, 12(7), 902. https://doi.org/10.3390/buildings12070902
Alvandi, B., Rosyati, R., & Abdu, M. (2021). Analisis perbandingan biaya pelaksanaan pekerjaan balok metode konvensional dan precast pada proyek Aspena Residence Batuceper. Structure, 3(1), 96. https://doi.org/10.31000/civil.v3i1.7156
Andriawan, E. (2020). Metode pelaksanaan pekerjaan kolom pada proyek Gedung Arandra Residence Jakarta.
Bigwanto, A., Widayati, N., Wibowo, M. A., & Sari, E. M. (2024). Lean construction: A sustainability operation for government projects. Sustainability, 16(8), 3386. https://doi.org/10.3390/su16083386
Daoud, A. O., Hefnawy, M. E., & Wefki, H. (2023). Investigation of critical factors affecting cost overruns and delays in Egyptian megaconstruction projects. Alexandria Engineering Journal. https://doi.org/10.1016/j.aej.2023.10.052
Idrees, S., & Shafiq, M. (2021). Factors for time and cost overrun in public projects. Journal of Engineering, Project, and Production Management. https://doi.org/10.2478/jeppm-2021-0023
Mohamed, A. S., Xiao, F., & Hettiarachchi, C. (2022). Project level management decisions in construction and rehabilitation of flexible pavements. Automation in Construction, 133, 104035. https://doi.org/10.1016/j.autcon.2021.104035
Mohammed, M., Shafiq, N., Elmansoury, A., Al-Mekhlafi, A.-B. A., Rached, E. F., Zawawi, N., Haruna, A., Rafindadi, A. D., & Ibrahim, M. (2021). Modeling of 3R (Reduce, Reuse and Recycle) for sustainable construction waste reduction: A partial least squares structural equation modeling (PLS-SEM). Sustainability. https://doi.org/10.3390/su131910660
Orobia, L. A., Nakibuuka, J., Bananuka, J., & Akisimire, R. (2020). Inventory management, managerial competence and financial performance of small businesses. Journal of Accounting in Emerging Economies, 10(3), 379–398. https://doi.org/10.1108/jaee-07-2019-0147
Priyo, M. (2021). Earned value management system in Indonesian construction projects. International Journal of Integrated Engineering. https://doi.org/10.30880/ijie.2021.13.03.005
Rachmawati, F., Mudjahidin, M., & Dewi Widowati, E. (2022). Work rate modeling of building construction projects using system dynamic to optimize project cost and time performance. International Journal of Construction Management, 24(2), 213–225. https://doi.org/10.1080/15623599.2022.2122265
Rossaty, R., Safitri, R. A., & Nabilah, S. A. (2023). Analisis perbandingan penggunaan bekisting konvensional dan bekisting alumunium terhadap biaya dan waktu (Studi kasus: Proyek Akasa Apartment Tower Kamaya, Bumi Serpong Damai, Tangerang Selatan). Structure, 4(2), 43. https://doi.org/10.31000/civil.v4i2.8062
Schützenhofer, S., Kovacic, I., Rechberger, H., & Mack, S. (2022). Improvement of environmental sustainability and circular economy through construction waste management for material reuse. Sustainability, 14(17), 11087. https://doi.org/10.3390/su141711087
Surono, A., & Rossyati, R. (2023). Faktor-faktor yang menyebabkan kegagalan bekisting pada proyek gedung sekolah St. Yohanes Pik2. Structure. https://doi.org/10.31000/civil.v5i2.10021
Terzioglu, T., Polat, G., & Turkoglu, H. (2021). Analysis of formwork system selection criteria for building construction projects: A comparative study. Buildings, 11(12), 618. https://doi.org/10.3390/buildings11120618
Umar, A. R., & Ranap Tua Naibaho, P. (2022). Proyek pembangunan jembatan rumah susun padat karya "Pengamatan pelaksanaan pekerjaan plat pada jembatan rumah susun padat karya." NUCLEUS, 3(1), 76–84. https://doi.org/10.37010/nuc.v3i1.791
Wibowo, M. A., Handayani, N. U., Mustikasari, A., Wardani, S. A., & Tjahjono, B. (2022). Reverse logistics performance indicators for the construction sector: A building project case. Sustainability, 14(2), 963. https://doi.org/10.3390/su14020963
Wyke, S., Lindhard, S., & Larsen, J. (2023). Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. Engineering Construction and Architectural Management. https://doi.org/10.1108/ecam-02-2022-0189
Yanita, R., & Nurdiyanto, N. (2023). Perbandingan kinerja pengecoran antara concrete-bucket dan concrete-pump pada proyek bangunan bertingkat. Racic: Rab Construction Research, 8(2), 296–307. https://doi.org/10.36341/racic.v8i2.3639
Zhong, Q., Tang, H., & Chen, C. (2022). A framework for selecting construction project delivery method using design structure matrix. Buildings. https://doi.org/10.3390/buildings12040443
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 JURAL RISET RUMPUN ILMU TEKNIK

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
_001.jpg)