Analisis Tenaga Kerja dalam Meningkatkan Produktivitas Pekerjaan pada Pembangunan Perumahan Palm Vista Residence
DOI:
https://doi.org/10.55606/jurritek.v5i1.8246Keywords:
AHP, Construction Project, Labor Productivity, LUR, Work SamplingAbstract
Labor productivity is a critical factor in construction project success as it directly affects time, cost, and work quality. In the Palm Vista Residence housing development project, delays in ground floor structural works indicate suboptimal human resource performance. This study aims to analyze labor productivity levels, identify factors influencing productivity, and formulate strategies to improve productivity in sloof beams, columns, and floor slab works. The research employs a quantitative approach with descriptive-analytical methods through field observations, questionnaires, and interviews. Labor productivity is measured using the work sampling method and the Labour Utilization Rate (LUR), while influencing factors are analyzed using multiple linear regression. Strategy prioritization for productivity improvement is determined using the Analytical Hierarchy Process (AHP). The results show that labor productivity is at a moderate level and is significantly influenced by work experience, managerial aspects, and coordination and planning. The priority strategies include improving worker competence and strengthening project management practices. These findings are expected to provide practical guidance for construction labor management to enhance efficiency and ensure timely project completion.
Downloads
References
Abudullah, Y., Usman, S. D., & Tuloli, M. Y. (2025). Analisis perbandingan produktivitas tenaga kerja terhadap analisa harga satuan pekerjaan (AHSP) SNI 2024 dan analisa di lapangan. Jurnal Ilmiah Multidisiplin, 4(2), 1–9. https://doi.org/10.54923/researchreview.v4i2.252
Angelica, N. P., & Puspasari, V. H. (2024). Kajian faktor-faktor yang mempengaruhi produktivitas tenaga kerja proyek konstruksi. Jurnal Basement, 2(1), 37–44. https://doi.org/10.36873/basement.v2i1.12757
Desfita, M., & Hamid, F. (2021). Work sampling methods dalam analisis produktivitas tenaga kerja konstruksi proyek pembangunan gedung (Studi kasus: Proyek pembangunan gedung kuliah Baiturrahmah). Jurnal Teknologi dan Sistem Informasi Bisnis, 3(1), 259–266. https://doi.org/10.47233/jteksis.v3i1.223
Fadillah, N. L., & Dita, I. N. P. P. (2024). Analysis of labor productivity on lightweight brick work using the work sampling method. Composite: Journal of Civil Engineering, 3(2), 1–12. https://doi.org/10.26905/cjce.v3i2.13097
Faradina, M. P., & Dewi, S. H. (2022). Analisis produktivitas tenaga kerja pekerjaan pembesian dan bekisting serta faktor-faktor yang mempengaruhinya. Jurnal Saintis, 22(2), 59–68. https://doi.org/10.25299/saintis.2022.vol22(02).25190
Jian, F., Liu, Q., Feng, C., Hu, Q., Yu, Q., & Guo, Q. (2025). Critical factors affecting construction labor productivity: A systematic review and meta-analysis. Buildings, 15(1), 1–23. https://doi.org/10.3390/buildings15142463
Krishnan, B. (2022). Analysis of labour productivity in construction industry using analytical hierarchy process and linear regression method. International Journal for Research in Applied Science and Engineering Technology, 10, 1770–1776. https://doi.org/10.22214/ijraset.2022.45365
Muslim, I., Zainuri, & Lubis, F. (2019). Analisis produktivitas tenaga kerja pada pekerjaan dinding facade (Studi kasus pada proyek pembangunan Hotel POP Pekanbaru). Siklus: Jurnal Teknik Sipil, 5(1), 12–22. https://doi.org/10.31849/siklus.v5i1.2388
Nurhendi, R. N., & Bastam, M. N. (2024). Analisis produktivitas tenaga kerja konstruksi dengan pendekatan relative importance index (RII). Jurnal Deformasi, 9(2), 167–177. https://doi.org/10.31851/deformasi.v9i2.17136
Pawiro, S., Tjakra, J., & Arsjad, T. T. (2015). Optimalisasi produktivitas tenaga kerja dalam proyek konstruksi (Studi kasus: Pembangunan Gedung Mantos Tahap III). Jurnal Tekno Sipil, 13(62), 1–6. https://doi.org/10.35793/jts.v13i62.8192
Pradhana, R. D., Trianto, A., & Fansuri, M. H. (2025). Factors affecting labor productivity in the construction sector: A literature review. Journal of Civil Engineering and Planning, 6(1), 1–15. https://doi.org/10.37253/jcep.v6i1.10288
Prakoso, S. H. (2024). Analisis produktivitas tenaga kerja proyek konstruksi pekerjaan shear wall dengan metode work sampling. Jurnal Go Infotech, 30(1), 96–104. https://doi.org/10.36309/goi.v30i1.264
Rini, I. (2019). Pengaruh produktivitas tenaga kerja terhadap kinerja waktu proyek pada bangunan bertingkat. Jurnal Infrastruktur, 3, 127–135. https://doi.org/10.35814/infrastruktur.v3i2.715
Sujana, C. M., & Hakim, R. A. (2021). Perbandingan produktivitas tenaga kerja pembesian dan bekisting saat jam kerja normal dan lembur menggunakan metode productivity rating. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), 4(September), 145–152.
Susanti, D. D., Supriani, F., & Misliniyati, R. (2025). Comparative analysis of labour plastering time on labour productivity with work sampling method. Jurnal Pensil: Pendidikan Teknik Sipil, 14(2), 316–330. https://doi.org/10.21009/jpensil.v14i2.54314
Thenu, G., Taihuttu, F., & Kempa, M. (2019). Analisis produktivitas pekerja konstruksi pada pekerjaan beton bertulang. Jurnal Simetrik, 9(2), 220–225. https://doi.org/10.31959/js.v9i2.369
Tukan, Y. K. B., Kurniawan, R. B., & Susanti, D. A. (2023). Analisis faktor-faktor yang mempengaruhi produktivitas karyawan dengan metode work sampling dan regresi linear berganda di PT Graha Nusa Pratama. Al-Kharaj: Jurnal Ekonomi, Keuangan & Bisnis Syariah, 5(6), 3094–3103. https://doi.org/10.47467/alkharaj.v5i6.2901
Walangitan, R. (2012). Produktivitas tenaga kerja dengan menggunakan metode work sampling pada pekerjaan kolom dan balok Mega Trade Center Manado. Tekno-Sipil, 10(57), 14–20. https://doi.org/10.35793/jts.v10i57.4312
Wibowo, K. D., & Prasetya, A. (2004). Analisa produktivitas pekerja dengan metode work sampling: Studi kasus pada proyek X dan Y. Civil Engineering Dimension, 6(2), 72–79. https://doi.org/10.9744/ced.6.2.72-79
Yanti, G. (2017). Produktivitas tenaga kerja dengan metode work sampling. Jurnal Teknik Sipil Siklus, 3(2), 100–106. https://doi.org/10.31849/siklus.v3i2.385
Yunita, A., & Hidayat, B. (2024). Perbandingan produktivitas tenaga kerja proyek konstruksi pada jam kerja normal. Jurnal Bangunan, Konstruksi & Desain, 2(3), 180–190. https://doi.org/10.25077/jbkd.2.3.180-190.2024
Yusuf, M. R., Utiarahman, A., & Sumaga, A. U. (2025). Analisis produktivitas tenaga kerja menggunakan work sampling pada pekerjaan kolom dalam proyek konstruksi. Jurnal Ilmiah Multidisiplin, 4(2), 1–13. https://doi.org/10.54923/researchreview.v4i2.229
Zakyahutami, F. R., Abduh, M. N., & Mulyani, S. P. (2025). Analisis produktivitas tenaga kerja perhitungan lapangan pada konstruksi bangunan gedung (Studi kasus pembangunan Mall Pelayanan Publik Kabupaten Gowa, Sulawesi Selatan). Jurnal Penelitian Teknik Sipil Konsolidasi, 3(2), 140–148. https://doi.org/10.56326/jptsk.v3i2.4699
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 JURAL RISET RUMPUN ILMU TEKNIK

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
_001.jpg)