Analisis Productivity PC 300 pada Kegiatan Coal Getting di PT. Asmin Bara Bronang

Authors

  • Maura Rahmawati Universitas Palangka Raya
  • Yustinus Hendra Wiryanto Universitas Palangka Raya
  • Yos David Inso Universitas Palangka Raya
  • Hepryandi Luwyk Djanas Usup Universitas Palangka Raya
  • Asri Fridtriyanda Universitas Palangka Raya

DOI:

https://doi.org/10.55606/jurritek.v5i2.8904

Keywords:

Coal Getting, Excavator PC 300, Material Characteristics, Operational Factors, Productivity

Abstract

This study was conducted at PT. Asmin Bara Bronang, Sepan Uring Village, Kapuas Tengah District, Kapuas Regency, Central Kalimantan Province, with the aim of analyzing the productivity and influencing factors of the PC 300 excavator in coal getting activities to support the achievement of production targets. The objective of this research is to analyze the actual productivity and the factors affecting it in Sector 7 coal getting operations. The research method used field observation with a quantitative descriptive analysis approach. The results show that the productivity of the PC 300 excavator ranges from 127.12 to 224.29 tons/hour, with an average of 173.98 tons/hour. In several conditions, the productivity is still below the company’s target of 180 tons/hour. The analysis indicates that productivity is influenced by material conditions, particularly the Hardgrove Grindability Index (HGI) value of 47, which reflects relatively harder material with coarser particle size, and a moisture content of 22.71%, causing the material to be sticky and cohesive, thereby affecting the bucket filling process. In addition, operational factors such as bottom loading patterns, limited number of tailgate dump trucks, and suboptimal selection of dump truck types also contribute to productivity performance.  Based on the findings, it can be concluded that the productivity of the PC 300 excavator has not consistently met the company’s target. Therefore, improvement efforts are required, including the implementation of top loading methods, increasing the number of tailgate dump trucks, optimizing the selection of hauling equipment, and controlling material conditions that affect the digging process.

 

 

Downloads

Download data is not yet available.

References

Ambeng, R. R., & Putrawiyanta, I. P. (2025). Pengamatan kegiatan coal getting PIT 2 di PT Dayak Membangun Pratama Kecamatan Kurun Kabupaten Gunung Mas Provinsi Kalimantan Tengah. Jurnal Teknik Pertambangan.

Ariansyah, A. (2023). Kajian teknis produktivitas alat gali muat dan alat angkut untuk mencapai target produksi batubara pada PT Surya Anugrah Sejahtera Desa Rantau Pandan, Kabupaten Muara Bungo, Provinsi Jambi (Skripsi). Universitas Jambi.

Arif, I. (2014). Batubara Indonesia. PT Gramedia Pustaka Utama.

ASTM International. (2014). Standard test methods for bulk and dry density of peat and peat products (ASTM D4531-15). ASTM International.

ASTM International. (2016). Standard test method for grindability of coal by the Hardgrove-machine method (ASTM D409/D409M-16). ASTM International.

Boggs, S. (2016). Principles of sedimentology and stratigraphy (4th ed.). Cambridge University Press.

Budhu, M. (2011). Soil mechanics and foundations (3rd ed.). John Wiley & Sons.

Caterpillar Inc. (2013). Caterpillar hauling handbook. Caterpillar Global Mining.

Caterpillar Inc. (2022). Performance handbook (42nd ed.). Caterpillar Inc.

Darmawan, A., & Basuki, R. (2015). Teknologi penambangan batubara. Deepublish.

Das, B. M. (2010). Principles of geotechnical engineering (7th ed.). Cengage Learning.

Dzakir, L. O., Dullah, N. M., Prianata, L. O., Yudha, W., Kurnia, L. M. H., Kadar, M. I., Shaddad, A. R., Amir, M. K., Ambarasari, I. S., & Aldiyansyah. (2023). Teknis penambangan nikel (S. G. Rustam & M. S. P. A. Rustam, Eds.). CV Tohar Media.

Dzakir, L. O., Shaddad, A. R., Syahrul, H., Kurnia, H., Aldiyansyah, A., Prianata, Y. L. O., Amir, M. K., Bakri, S., Kadar, M. I., & Mahmudah Dullah, N. (2024). Rekayasa perencanaan tambang (B. A. Ampangaloo & S. Antarissubhi, Eds.). CV Tohar Media.

Fahmi, M., & Ghuzdewan, T. A. (2023). Productivity analysis PC-300 and PC-400 in earthworks at a gold mining project in Indonesia. Journal of Civil and Environmental Engineering. https://doi.org/10.22146/jcef.6600

Friedman, G. M. (1979). Principles of sedimentology. Springer.

Hall, R. W. (2003). Introduction to construction equipment management. Prentice Hall.

Hartman, H. L., & Mutmansky, J. M. (2002). Introductory mining engineering (2nd ed.). Wiley.

Herjanto, E. (2007). Manajemen produksi dan operasi. Grasindo.

Hustrulid, W. A., & Kuchta, M. (2006). Open pit mine planning and design (2nd ed.). Taylor & Francis.

Jaya, R. (2013). Alat berat dan penggunaannya. Graha Ilmu.

Komatsu Ltd. (2009). Specification and application handbook (30th ed.). Komatsu Ltd.

Komatsu Ltd. (2015). Product specification and operation manual: PC300 series excavator. Komatsu Ltd.

Kujundžić, T. (2012). Surface mining equipment productivity factors. Mining Engineering, 64(5), 23–29.

McKinnon, R. C. (2010). Cause, effect, and control of accidental loss. CRC Press.

Mokoagow, F. Y., & Anondho, B. (2023). Faktor-faktor yang mempengaruhi produktivitas excavators pada pekerjaan galian di Solo dan Manado. JMTS: Jurnal Mitra Teknik Sipil, 6(1).

Nurhakim, A. (2016). Manajemen produksi pertambangan. Alfabeta.

Odorikus, O. G. M. (2024). Analisis match factor alat gali muat dan angkut pada kegiatan ore getting di blok I di PT Billy Indonesia Site Parenggean Kabupaten Kotawaringin Timur Provinsi Kalimantan Tengah (Skripsi). Universitas Palangka Raya.

Pemerintah Republik Indonesia. (2020). Undang-undang Republik Indonesia Nomor 3 Tahun 2020 tentang perubahan atas Undang-Undang Nomor 4 Tahun 2009 tentang pertambangan mineral dan batubara. Presiden Republik Indonesia. https://doi.org/10.31850/malrev.v4i2.628

Peurifoy, R. L., Schexnayder, C. J., Shapira, A., & Schmitt, R. (2011). Construction planning, equipment, and methods (8th ed.). McGraw-Hill.

Prodjosumarto, P. (1993). Teknologi mekanisasi tambang. Institut Teknologi Bandung.

PT Asmin Bara Bronang. (n.d.). Coal concession. Turangga Resources. Diakses 18 Mei 2025, dari https://www.turanggaresources.com/id/coal-concession/pt-asmin-bara-bronang

Putrawiyanta, I. P., Nadeak, R., & Nababan, I. (2024). Produktivitas alat gali muat dan angkut pada kegiatan overburden removal dan coal getting. Jurnal Teknika, 8(1), 15–20. https://doi.org/10.36873/jtp.v24i2.14875

Simamora, A., Putrawiyanta, I. P., Iashania, Y., Wiryanto, Y. H., & Fridtriyanda, A. (2025). Analisis produktivitas excavator Komatsu PC 300 pada kegiatan coal getting di PT Lautan Hutan Lestari Kecamatan Teweh Tengah Kabupaten Barito Utara Provinsi Kalimantan Tengah. Jurnal Teknik Pertambangan.

Soetrisno, S., Supriatna, S., Rustandi, E., Sanyoto, P., & Hasan, K. (1994). Peta geologi lembar Buntok, Kalimantan skala 1:250.000 [Peta]. Pusat Penelitian dan Pengembangan Geologi. https://www.tutorialkitacerdas.my.id/2020/09/download-peta-geologi-regional-lembar-kalimantan.html

Speight, J. G. (2013). The chemistry and technology of coal (3rd ed.). CRC Press. https://doi.org/10.1201/b12497

Supriatna, S., Sudradjat, A., & Abidin, H. Z. (1995). Peta geologi lembar Muaratewe, Kalimantan skala 1:250.000 [Peta]. Pusat Penelitian dan Pengembangan Geologi. https://www.tutorialkitacerdas.my.id/2020/09/download-peta-geologi-regional-lembar-kalimantan.html

Thomas, L. (2002). Coal geology. Wiley. https://doi.org/10.1002/9781118385729

Ward, C. R. (2016). Analysis, sampling and testing of coal. CSIRO Publishing.

Downloads

Published

2026-05-02

How to Cite

Maura Rahmawati, Yustinus Hendra Wiryanto, Yos David Inso, Hepryandi Luwyk Djanas Usup, & Asri Fridtriyanda. (2026). Analisis Productivity PC 300 pada Kegiatan Coal Getting di PT. Asmin Bara Bronang. JURAL RISET RUMPUN ILMU TEKNIK, 5(2), 366–376. https://doi.org/10.55606/jurritek.v5i2.8904

Similar Articles

<< < 7 8 9 10 11 12 13 14 15 16 > >> 

You may also start an advanced similarity search for this article.