Penerapan Sistem BIM dengan Autodesk Revit dalam Perhitungan Volume Pekerjaan pada Proyek Gedung Laboratorium Fakultas Teknik Universitas Tanjungpura

Authors

  • Ardi Giovani Universitas Tanjungpura
  • Safaruddin M. Nuh Universitas Tanjungpura
  • Lusiana Lusiana Universitas Tanjungpura

DOI:

https://doi.org/10.55606/jurritek.v4i3.8366

Keywords:

Autodesk Revit, Building Information Modeling (BIM), Construction Planning, Revit Modeling Tools, Work Volume Analysis

Abstract

Work volume calculations are essential for project cost estimation. Many projects, such as the Laboratory Building of the Faculty Engineering at Tanjungpura University, calculate work volumes conventionally. Conventional calculation considered less efficient and prone to errors. Building Information Modeling (BIM) provides a solution that produces more accurate and efficient calculations than conventional methods. This research aims to compare structural work volume results produced by BIM using Autodesk Revit against conventional methods and project’s BOQ. This research also describes the benefits and challenges of BIM implementation based on the researcher’s experience applying BIM with Autodesk Revit in work volume calculation. The comparison between BIM and conventional method shows a maximum difference of 2% across all work items. Meanwhile, the comparison between BIM and the BOQ shows significant differences: 81% in column formwork area, 24% in grade beam/beam concrete volume, 25% in column reinforcement weight, 25% in steel beam weight, and 10% in the steel plate weight. This research proves that BIM implementation produces more accurate and efficient calculations and serves as an effective BOQ cross-check tool. Based on the researcher’s experience in implementing BIM with Autodesk Revit, challenges found in procurement aspects, modeling aspects, and model dependency on reference drawings.

 

 

Downloads

Download data is not yet available.

References

Alimin, M., Imron, & Taulani, M. (2023). Penerapan Building Information Modelling (BIM) Autodesk Revit dalam Pembuatan Bar Bending Schedule (BBS) Pondasi Pile Cap Proyek Apartemen Jkt Living Star - Jakarta Timur. Jurnal Riset Rumpun Ilmu Teknik, 2(2), 21-32. https://doi.org/10.55606/jurritek.v2i2.1599

Amri, S. I., Hardyanti, N., & Sumiyati, S. (2023). Analisis Perbandingan Quantity Take Off (QTO) Beton Menggunakan Metode Building Information Modelling (BIM) dan Metode Konvensional (Studi Kasus: Proyek Kantor PNM Cabang Jember). Jurnal Profesi Insinyur Indonesia, 1(6), 225-233. https://doi.org/10.14710/jpii.2023.19025

Anwar, M. R., & Nurchasanah, Y. (2023). Perbandingan Quantity Take-Off Beton Antara Metode Konvensional Dengan Metode BIM Pada Gedung 13 Lantai. Prosiding Seminar Nasional Teknik Sipil, 680-684. Retrieved from https://proceedings.ums.ac.id/sipil/article/download/2780/2743/2823

Astuti, P., Kurnianto, R., & Puspitasari, S. D. (2023). Pemanfaatan Building Information Modelling (BIM) Pada Perancangan Struktur Baja. Jurnal Teknik Sipil, 17(April), 84-94. https://doi.org/10.24002/jts.v17i2.6371

Ferial, R., Hidayat, B., Pesela, R. C., & Daoed, D. (2021). Quantity Take-Off Berbasis Building Information Modeling (BIM) Studi Kasus: Gedung Bappeda Padang. Jurnal Rekayasa Sipil (JRS-Unand), 17(3), 228-238. https://doi.org/10.25077/jrs.17.3.228-238.2021

Gunawan, M., & Kartika, N. (2021). Penerapan Building Information Modeling (BIM) Pendahuluan. Jurnal Student Teknik Sipil, 3(2), 407-420. https://doi.org/10.37150/jsts.v3i2.1655

Ihsan, S. A., & Wacano, S. (2024). Analisis Perbandingan Perhitungan Quantity Take Off Menggunakan BIM Revit Dengan Metode Pembangunan Gedung RSPON. Seminar Nasional Teknik Sipil Politeknik Negeri Jakarta, 336-343. Retrieved from https://prosiding.pnj.ac.id/index.php/snts/article/download/2727/1906

Jonathan, R., & Anondho, B. (2021). Perbandingan Perhitungan Volume Pekerjaan Dak Beton Bertulang Antara Metode BIM Dengan Konvensional. JMTS: Jurnal Mitra Teknik Sipil, 4(1), 271-280. https://doi.org/10.24912/jmts.v0i0.10473

Juliani, M. P., & Renaningsih, R. (2023). Analisa Perbandingan Volume Beton Metode Konvensional pada Hasil Bill of Quantity (BQ) dan BIM Autodesk Revit 2020 terhadap Efektifitas Biaya. Prosiding Seminar Nasional Teknik Sipil UMS, 631-637. Retrieved from https://proceedings.ums.ac.id/sipil/article/view/2773

Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR) (2018). Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 22/PRT/M/2018 Tahun 2018 tentang Pembangunan Bangunan Gedung Negara.

Laorent, D., Nugraha, P., & Budiman, J. (2019). Analisa Quantity Take-Off Dengan Menggunakan Autodesk Revit. Dimensi Utama Teknik Sipil, 6(1), 1-8. https://doi.org/10.9744/duts.6.1.1-8

Novita, R. D., & Pangestuti, E. K. (2021). Analisa Quantity Take Off dan Rencana Anggaran Biaya dengan Metode Building Information Modeling (BIM) Menggunakan Software Autodesk Revit 2019 (Studi Kasus: Gedung LP3 Universitas Negeri Semarang). Dinamika Teknik Sipil, 14(1), 27-31. https://doi.org/10.23917/dts.v14i1.15276

Pratama, A., & Marzuki, P. F. (2024). Kajian Implementasi BIM (Building Information Modeling) di Indonesia Berdasarkan Perspektif Pelaksana Konstruksi (Studi Kasus: Proyek Kontraktor BUMN). Jurnal Teknik Sipil, 30(2), 277-296. https://doi.org/10.5614/jts.2023.30.2.15

PT. Garuda Yamato Steel. (2024). Garuda Yamato Steel Product Catalogue. Retrieved from https://www.garudayamatosteel.com/wp-content/uploads/2024/07/GYS-Product-Catalogue-v11small.pdf

PT. Lintech Indo Pratama. (2019). Weight Table (Vol. 7666891). Retrieved from https://www.lintech.co.id/files/Lintech Standard.pdf

Reista, I. A., Annisa, A., & Ilham, I. (2022). Implementasi Building Information Modelling (BIM) dalam Estimasi Volume Pekerjaan Struktural dan Arsitektural. Journal of Sustainable Construction, 2(1), 13-22. https://doi.org/10.26593/josc.v2i1.6135

Sholeh, G. I. (2025). Efektivitas dan Akurasi Metode Manual dan BIM dalam Perhitungan Volume Pile Cap dan Pembesian Bangunan Gedung. Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang Dan Teknik Sipil, 3(2), 89-101. https://doi.org/10.61132/konstruksi.v3i2.786

Soetjipto, J. W., Zarkasi, I. K., & Trisiana, A. (2023). Model Perancangan Pemeliharaan Bangunan Gedung Menggunakan Building Information Modeling (BIM). Jurnal Teknik Sipil, 18(1), 1-15. https://doi.org/10.31815/jp.2023.18.1-15

Tigauw, F. M., Aprilianto, F., & Santoso, H. T. (2023). Analisa Perhitungan Quantity Material Take-Off (QMTO) Struktur Bawah Jembatan Tipe Skew dengan Menggunakan BIM Autodesk Revit. Jurnal Inovasi Konstruksi, 2(2), 58-65. https://doi.org/10.56911/jik.v2i2.44

Zahrah, K., Lenggogeni, & Berliana, R. (2023). Implementasi BIM dalam Perhitungan Quantity Take-Off Pekerjaan Struktur dan Arsitektur Proyek RTCT Pertamina. Jurnal Deformasi, 8(2), 178-191. https://doi.org/10.31851/deformasi.v8i2.13407

Zakaria Rugas, Waluyo, R., & Almuntofa Purwantoro. (2024). Analisis Quantity Take Off Dengan Metode Building Information Modeling Pada Pekerjaan Struktur Gedung Poltekkes Palangka Raya. Jurnal Saintis, 24(01), 29-38. https://doi.org/10.25299/saintis.2024.vol24(01).16561

Downloads

Published

2025-12-31

How to Cite

Ardi Giovani, Safaruddin M. Nuh, & Lusiana Lusiana. (2025). Penerapan Sistem BIM dengan Autodesk Revit dalam Perhitungan Volume Pekerjaan pada Proyek Gedung Laboratorium Fakultas Teknik Universitas Tanjungpura. JURAL RISET RUMPUN ILMU TEKNIK, 4(3), 744–765. https://doi.org/10.55606/jurritek.v4i3.8366

Similar Articles

<< < 5 6 7 8 9 10 11 12 13 14 > >> 

You may also start an advanced similarity search for this article.