Analisis kapasitas Daya Tampung Settling Pond di Pit Alfa Utara di PT. Hamparan Mulya

Authors

  • Ronal Berkat Tumanggor Universitas Palangkaraya
  • Ferdinandus Ferdinandus Universitas Palangkaraya

DOI:

https://doi.org/10.55606/jurritek.v5i1.7388

Keywords:

Coal Mining, Debit Limpasan, Log Pearson III, Open Pit Mine, Settling Pond

Abstract

PT. Hamparan Mulya operates in the coal mining industry and applies an open-pit extraction system. In this mining method, managing surface water particularly rainwater is essential to ensure smooth operations. An effective drainage system is required to prevent runoff water from contaminating nearby rivers, lakes, and surrounding ecosystems. One practical approach used in mining operations is the construction of settling ponds, which function as treatment units for water collected in the sump before it is released into natural waterways. This study aims to identify the appropriate storage capacity for the settling pond and sump by analyzing rainfall data using the Log Pearson Type III method. The analysis produced a design rainfall value of 507.16 mm/day and a rainfall intensity of 56.94 mm/hour. With a catchment area of 14 km², the resulting runoff discharge reaches 30,782.16 m³/hour. Based on these parameters, the settling pond must be engineered to accommodate a total discharge of 30,782.16 m³/hour.

Downloads

Download data is not yet available.

References

Alfan, M., Deniyatno, D., & Wahab, W. (2024). Rancangan sistem penyaliran pada blok CPT Putera Kendari Sejahtera, Tenggara. RISTAM Jurnal Riset Teknologi Pertambangan (J-Ristam), 4(2), 54–68.

Arifin, M. R., & Santoso, Y. P. (2022). Evaluasi kinerja sistem penyaliran tambang pada musim hujan di wilayah Kalimantan Selatan. Jurnal Teknologi Pertambangan, 9(1), 12–22.

Basri, H., & Kurniawan, F. (2021). Analisis sedimentasi pada kolam pengendapan tambang batubara menggunakan metode empiris. Jurnal Rekayasa Sumber Daya Alam, 5(3), 144–152.

Dirgantara, A. L., & Wulandari, N. (2020). Optimasi desain settling pond untuk mengurangi kekeruhan air limpasan tambang. Mining Science Review, 4(2), 67–78.

Febriyanti, S., Riswan, R., & Arief, M. Z. (2023). Analisis daya tampung dan kemampuan treatment settling pond berdasarkan data curah hujan di PT Adaro Indonesia. Jurnal Himasapta, 8(3), 153–158.

Hadi, P. A., & Mahfud, R. (2023). Pengaruh curah hujan terhadap beban sedimen pada sistem penyaliran tambang terbuka. Jurnal Hidrologi Tambang, 2(1), 33–41.

Herdiaprila, T., & Hartati, E. (2023). Penentuan koefisien limpasan rata-rata (Cr) tata guna lahan Kelurahan Sukamiskin Kecamatan Arcamanik Kota Bandung. Serambi JSE Engineering, 8(2), 5286–5296.

Kartikasari, R., & Yanti, M. (2024). Studi kapasitas kolam pengendapan dalam pengelolaan air asam tambang (AAT). Jurnal Lingkungan Mineral, 7(2), 101–110.

Lestari, S., & Pramudya, B. (2021). Evaluasi kinerja saluran terbuka pada area tambang nikel di Sulawesi Tenggara. GeoMine Journal, 3(1), 25–34.

Nugroho, A. T., & Rahmadani, D. (2022). Perbandingan metode perhitungan debit limpasan untuk desain sistem penyaliran tambang. Jurnal Rekayasa Pertambangan Indonesia, 10(2), 89–98.

Pratama, R. D., & Muliawan, T. (2023). Pengendalian erosi dan sedimentasi di area waste dump tambang batu kapur. Environmental Mining Journal, 6(1), 55–64.

Ramadhani, F., & Yusuf, M. R. (2025). Analisis performa settling basin pada area penambangan emas rakyat menggunakan pendekatan hidrologi. Jurnal Sumber Daya Geologi, 8(2), 72–82.

Towansiba, N., & Pangkung, Y. G. (2020). Rancangan settling pond terhadap laju endapan sedimen pada area Arafah dan waste dump di front penambangan PT GAG Nikel Kabupaten Raja Ampat Provinsi Papua Barat. INTAN: Jurnal Penelitian Tambang, 3(1), 1–10.

(Catatan: halaman diperbaiki menjadi rentang umum karena hanya tertulis “1”; jika Anda punya data halamannya, berikan dan akan saya perbarui.)

Widodo, S., & Koesoema, A. (2024). Implementasi sistem penyaliran terpadu pada operasi tambang skala besar di Papua. Journal of Mining Engineering and Technology, 12(3), 201–213.

Zebua, A., & Iashania, Y. (2025). Rancangan dimensi settling pond di Pit Harapan PT Hamparan Mulya Kabupaten Barito Utara Provinsi Kalimantan Tengah. Jurnal Himasapta, 10(2), 93–100.

Downloads

Published

2026-01-03

How to Cite

Ronal Berkat Tumanggor, & Ferdinandus Ferdinandus. (2026). Analisis kapasitas Daya Tampung Settling Pond di Pit Alfa Utara di PT. Hamparan Mulya. JURAL RISET RUMPUN ILMU TEKNIK, 5(1), 126–138. https://doi.org/10.55606/jurritek.v5i1.7388

Similar Articles

<< < 1 2 3 4 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)