Studi Teknoekonomi PLTS Apung 141,4 kWp Bendungan Telaga Tunjung Bali

Authors

  • Julius Mahendra Sihombing Universitas Udayana
  • Surung Rafael Sihaloho Universitas Udayana
  • I Nyoman Satya Kumara Universitas Udayana
  • I Wayan Sukerayasa Universitas Udayana
  • Wayan Gede Ariastina Universitas Udayana

DOI:

https://doi.org/10.55606/jurritek.v4i3.6893

Keywords:

CO2 Emission Reduction, Economic Feasibility Analysis, Floating PV System, Renewable Energy, Telaga Tunjung Dam

Abstract

The increasing demand for electrical energy and the issue of climate change are driving the utilization of renewable energy, one of which is through Solar Power Plants (PLTS). The Province of Bali targets the development of PLTS of 108.2 MW, equivalent to 8.62% of the total solar energy potential of 1,254 MW by 2025. However, land limitations pose an obstacle to the construction of large-scale PLTS. Floating solar power plant design can be a solution to this issue. By utilizing 4,955.32 m² of water surface at the Telaga Tunjung Dam, the Floating Solar Power Plant at Telaga Tunjung Dam has a potential capacity of 141.4 kWp, using 280 Trina Solar modules of type TSM-DEG18MC.20(II) (505 Wp) combined with one SG110CX inverter with a capacity of 110 kW. The annual electricity production of the floating solar power plant, based on Helioscope software, is 201.1 MWh. The economic feasibility parameters used in this study include initial investment cost, Profitability Index (PI), and Payback Period (PP). The analysis results show that the 141.4 kWp floating solar power plant project at Telaga Tunjung Dam has an initial investment value of IDR 1,248,764,582, a PI of 1.26, and a PP of 3.91 years. Therefore, this project is considered economically feasible and contributes positively to reducing CO₂ emissions.

Downloads

Download data is not yet available.

References

Al-Ezzi, A. S. (2022). Photovoltaic solar cells: A review. MDPI.

Badan Standard Nasional. (2017). Panduan studi kelayakan pembangunan Pembangkit Listrik Tenaga Surya (PLTS) fotovoltaik. Retrieved August 8, 2025, from https://akses-sni.bsn.go.id/dokumen/2017/SNI%208395-2017/#p=1

Balai Wilayah Sungai Bali-Penida. (2006). Pemeriksaan besar Bendungan Telaga Tunjung di Kabupaten Tabanan.

Esparza, I. (2024). Floating PV systems as an alternative power source: Case study. Sustainability, 16(3). https://doi.org/10.3390/su16031345

Fiddiansyah, D. B. (2024). The planning study of 145 MW grid connected Cirata's floating PV to support the security of supply in Jawa Bali power systems. Journal of Technology and Policy in Energy and Electric Power, 1.

Fitriana, I. (2017). Outlook energi Indonesia 2017. Badan Pengkajian dan Penerapan Teknologi.

Jifaturrohman, M. I. (2025). Hydrodynamic modeling of unstretched length variations in. MDPI.

Kunaifi. (2011). Desain pembangkit listrik hybrid (PLTS-diesel) untuk meningkatkan pelayanan kesehatan di Puskesmas Kecamatan Gema Kabupaten Kampar. Jurnal Sains, Teknologi dan Industri, 10, 15–21.

Menteri Energi dan Sumber Daya Mineral Republik Indonesia. (2021). Penerapan standar kualitas modul fotovoltaik silikon kristalin.

Nafeh, A. E. A. (2009). Design and economic analysis of a stand-alone PV system to electrify a remote area household in Egypt. Open Renewable Energy Journal, 2, 33–37. https://doi.org/10.2174/1876387100902010033

Nathawibawa, A. N. B. B. (2017). Analisis produksi energi dari inverter pada grid-connection PLTS 1 MWp di Desa Kayuhibi Kabupaten Bangli. Teknologi Elektro, 16. https://doi.org/10.24843/MITE.1601.18

Pawitra, A. (2020). Review perkembangan PLTS di Provinsi Bali menuju. Majalah Ilmiah Teknologi Elektro, 19. https://doi.org/10.24843/MITE.2020.v19i01.P08

Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia Nomor 6 Tahun 2020 tentang perubahan atas Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 27/PRT/M/2015 tentang bendungan. (2020).

Ridwan Margana, R. (2024). Analisis kelayakan investasi proyek pengadaan alat pengembangan chamber balai uji dengan menggunakan net present value, internal rate return, dan payback period di PT DEF. Lentera Bisnis, 5(2). https://doi.org/10.46306/lb.v5i2.683

Shema, S. (2011). Study of inverter design and topologies for. ResearchGate. https://doi.org/10.1109/INECCE.2011.5953934

Solomin, E. (2021). Hybrid floating solar plant designs: A review. Energies, 14(10). https://doi.org/10.3390/en14102751

Thyra, M. F., & K. A. M. (2015). Analisis ekonomi penggunaan inverter sel surya pelanggan rumah tangga terhubung dengan jaringan pada perumahan Syailendra Residence Banyumanik Semarang, 1–15.

Yuki, K. (2017). Analisis tekno-ekonomi terhadap desain sistem PLTS pada bangunan komersial di Surabaya, Indonesia.

Yusof, N. B. M. (2020). The study of output current in photovoltaic cells in series and parallel connections. International Journal of Technology, Innovation and, 1, 7–12. https://doi.org/10.29210/88701

Downloads

Published

2025-10-14

How to Cite

Julius Mahendra Sihombing, Surung Rafael Sihaloho, I Nyoman Satya Kumara, I Wayan Sukerayasa, & Wayan Gede Ariastina. (2025). Studi Teknoekonomi PLTS Apung 141,4 kWp Bendungan Telaga Tunjung Bali. JURAL RISET RUMPUN ILMU TEKNIK, 4(3), 717–733. https://doi.org/10.55606/jurritek.v4i3.6893

Similar Articles

<< < 1 2 3 4 5 6 7 8 9 10 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)