Analisis Pengaruh Kapasitor Bank Terhadap Besaran Listrik di Gedung World Trade Centre Jakarta
DOI:
https://doi.org/10.55606/jurritek.v4i3.6879Keywords:
Capacitor, Detuned Reactor, Electrical Energy, ETAP, Power FactorAbstract
High-rise buildings such as the World Trade Center Jakarta generally have high inductive electrical loads, so that their reactive power consumption is large and the power factor decreases below the SPLN standard (≤0.85), resulting in increased power losses and operational costs. This study aims to measure the power factor value before and after repairing the detuned reactor and capacitor on the capacitor bank panel, compare the results of field measurements with ETAP simulations, and assess the feasibility of the installed capacitor bank and determine the difference in the results of the ETAP simulation between measurements and load calculations on the World Trade Center building. The methods used include literature review, field observations on the LVMDP panel, MCC and capacitor bank, discussions with supervisors, data collection of current, voltage, kW, kVAR, kVA and cos φ using Lovato DCRG8 and ampere clamp, and load simulation using ETAP software. The results show that the cosφ value increased from 0.70 to 0.95 (an increase of 35.71%), the compensated reactive power reached 204 kVAR (Lovato), 282.6 kVAR (tang ampere), and 415 kVAR (ETAP simulation), with a power factor or cosφ = 0.95. In conclusion, the replacement of detuned reactors and capacitors effectively improves the power factor in the WTC Jakarta Building, reduces reactive loads, and the ETAP simulation results are consistent with field measurements, so that the capacitor bank installed in the WTC building is declared effective in reducing reactive currents, thereby reducing kVAR, kVA loads and improving the efficiency of the electrical system distribution for better energy management
Downloads
References
Aditya, L., & Ilmianta Alhakam Rizky. (2022). Analisis Konsumsi Daya Pemasangan Kapasitor Bank Pada Sistem Jaringan Listrik Tegangan Rendah Di Hotel THE 101 Cengkareng. Braz Dent J., 33(1), 1–12.
Afriditus, Arsyad M.I, & Abidin Zainal. (2022). Perhitungan Rugi-Rugi Daya Dan Energi Listrik Pada Jaringan Tegangan Menengah 20 KV PT PLN (PERSERO) ULP Nanga Pinoh. Jurnal Teknik Elektro.
Aisyah Indah Almira, Toto Tohir, & Supriyanto. (2024). Analisa Pengaruh Kapasitor Bank Terhadap Faktor Daya dan Penghematan Biaya Listrik Berbasis Simulasi Software ETAP 20. Prosiding Industrial Research Workshop and National Seminar, 15(1), 429–436. https://doi.org/10.35313/irwns.v15i1.6243
Al Firdausi, B. I., Auliq, M. A., & Fitriana, F. (2024). Analisis Kebutuhan Bank Kapasitor Untuk Perbaikan Faktor Daya di PT Beras Rajawali Menggunakan Optimal Capacitor Placement ETAP 19. Jurnal Listrik, Instrumentasi, Dan Elektronika Terapan, 5(1), 39. https://doi.org/10.22146/juliet.v5i1.89376
Alland, K., & Arfah Z., E. (2013). Perancangan Kebutuhan Kapasitor Bank Untuk Perbaikan Faktor Daya Pada Line Mess I Di Pt. Bumi Lamongan Sejati (Wbl). Jurnal Teknik Elektro, 2(1), 29–35.
Aulia Bagus Ar Rahmaan, O. P. N. K. A. (2016). Optimalisasi Penempatan Kapasitor Bank untukMemperbaiki Kualitas Daya Pada Sistem KelistrikanPT. Semen Indonesia Aceh MenggunakanMetode Genetic Algorithm (GA). Jurnal Teknik Its, 5(2).
Balisranislam, Partaonan Harahap, S. L. (2023). Perancangan Alat Inverator Energi Listrik Menggunakan Simulink Matlab. 6(1), 48–53.
Basudewa, D. A. (2020). Analisa Penggunaan Kapasitor Bank terhadap Faktor Daya Pada Gedung IDB Laboratory UNESA. Jurnal Teknik Elektro, 09(03), 697–707.
Hasibuan, A., Ezwarsyah, E., & Nasution, I. K. (2020). Penentuan Kapasitas Kapasitor Shunt Dalam Perbaikan Cos Φ Pada Gedung Workshop Teknik Mesin Unimed Dengan Beban Yang Bervariasi. Journal of Electrical and System Control Engineering, 3(2), 94–107.
Ilmyhanifzuhud, Sapto Nisworo, H. T. S. (2000). Evaluasi Nilai Kapasitor Bank Guna Perbaikan Faktor Daya Studi Kasus Di Cv. Sari Kayu Jaya Klaten 1-5
Ismail, Sarma Thaha, Agus Salim, S. (2020). Optimasi Jaringan Distribusi Listrik Dengan Pemasangan Kapasitor Pada Jaringan Tegangan Menengah 6.3 Kv Pt. Semen Tonasa. Prosiding Seminar Nasional NCIET, 1(1), 509–517. https://doi.org/10.32497/nciet.v1i1.167
Letifa Shintawaty. (2013). Peranan Daya Reaktif Pada Sistem Kelistrikan. Jurnal Desiminasi Teknologi, 1(2), 1–20.
Lovato Electric S.p.A. (2022). Power Factor Controller DCRG8. Catalogue.Lovatoelectric.Com. https://catalogue.lovatoelectric.com/gl_en/DCRG8/snp
Muhammad Faris Nizam, Muslimin, R. M. U. (2023). Evaluasi Pemakaian Energi Listrik Menggunakan Power Realtime Monitoring System Di Gedung Lecture Building Fakultas Teknik Universitas Mulawarman Dalam Upaya Efisiensi Energi Listrik. 2(2).
Nadeak, D. R., Lisapaly, L., Sinambela, R., & Manik, M. (2024). Analisis Pengukuran Kapasitor Bank Dengan Tuned Reactor Pada Gedung Atria Residences Gading Serpong. Transmisi: Jurnal Ilmiah Teknik Elektro, 26(3), 122–131. https://doi.org/10.14710/transmisi.26.3.122-131
Nizam, M. K. (2019). Analisis Perbaikan Kualitas Daya Menggunakan Kapasitor Bank Pada Penyulang Lumumba PT. PLN Ngagel Surabaya. Sustainability (Switzerland), 11(1), 1–14. https://doi.org/10.1088/1751-8113/44/8/085201
Noor, S., & Saputera, N. (2014). Kapasitor Bank. Efisiensi Pemakaian Daya Listrik Menggunakan Kapasitor Bank, 6(2), 1–6.
Parid, M., Dinata, S., & Supriadi, O. (2023). Analisis Kapasitas Kapasitor Bank Di Gedung A Universitas Pamulang. 01(01), 30–38. https://doi.org/10.32493/yepei.v1i1.28843
Ricardo, S. C., Zuraidah, T., & Erpandi Dalimunthe. (2016). Optimalisasi Kapasitor Bank Untuk Peningkatan Faktor Daya Pada Beading Plant Di PT Permata Hijau Palm Oleo KIM II. 7, 1–23.
Rofii, A., & Ferdinand, R. (2018). Analisa Penggunaan Kapasitor Bank Dalam Upaya Perbaikan Faktor Daya. Jurnal Kajian Teknik Elektro, 3(1), 39–51.
Situmorang, H. F., Wibowo, P., & Lubis, Z. (2024). Analisis Penggunaan Kapasitor Bank Dalam Upaya Perbaikan Faktor Daya Pada Low Voltage Main Distribution Panel (LVMDP) Di PT.Permata Hijau Palm Oleo (PHPO) KIM II. 7, 990–1001.
Sulistyowati Riny dan, & Febrianto Dedi Dwi. (2015). Perancangan Prototype Sistem Kontrol Dan Monitoring Pembatas Daya Listrik Berbasis Mikrokontroler. Jurnal Iptek, 16, 10–21. http://jurnal.itats.ac.id/wp-content/uploads/2013/06/4.-RINY-FINAL-hal-24-32.pdf
Sultan, A. R., & Gaffar, A. (2017). Perbaikan Faktor Daya Pada Instalasi Tenaga Untuk Berbagai Kondisi Pemasangan. Jurnal Teknologi Elekterika, 14(2), 182. https://doi.org/10.31963/elekterika.v14i2.1224
Sumarno, R. N., Handoko, S., & Facta, M. (2020). The Improvement of Electric Power Losses Using Bank Capacitor and Tap Changer With Shark Smell Algorithm.Teknik,41(3),212–218. https://doi.org/10.14710/teknik.v41i3.24818
Syukri, M., Suriadi, Sara, I. D., Siregar, R. H., Muhibbuddin, & Masri. (2023). Optimalisasi Performa Sistem Tegangan dengan Pemasangan Kapasitor Bank pada Pembangkit Listrik Tenaga Uap (PLTU) Nagan Raya. Journal of Engineering and Science, 2(1), 36–44. https://doi.org/10.56347/jes.v2i1.165
Triyanto, M. F. G. (2021). Sekilas Tentang Software ETAP Beserta Tollbarnya. Anakteknik.Co.Id. https://www.anakteknik.co.id/fauzan_triyanto02/articles/sekilas-tentang-software-etap-beserta-tollbarnya?srsltid=AfmBOooDkKXyVM8tSqYS6YN G3ymWd0cdmQWqaeK9Z6QQUw6QyeBqJFc3
Zhafran, A., Triyanto, A., & Permana, H. (2023). Analisa Pengaruh Nilai Kapasitor Bank Terhadap Faktor Daya Pada Gedung Treasury Tower. Seminar Riset Mahasiswa-Computer & Electrical (SERIMA-CE, 1(1), 281–287. http://seminarsetup.com/id/serima
Zulfy Rizal Firmansyah, A. T. (2024). Jurnal Ilmiah Sains dan Teknologi Analisa Faktor Daya Pada Kapasitor Bank Sesuai Standar PUIL 2000 DI Synergi Building Program Studi Teknik Elektro , Fakultas Teknik , Universitas Pamulang Jurnal Ilmiah Sains dan Teknologi. 3(September), 93–105.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 JURAL RISET RUMPUN ILMU TEKNIK

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
_001.jpg)