Direction of Progress, Mine Dewatering, Runoff Discharge, Sump Dimension, SumpAbstract
A sump is a water reservoir that functions to accommodate runoff water in the pit before the water is pumped. This study was conducted to determine the location plan and sump capacity based on the direction of mine progress and the actual estimation of runoff discharge that enters the pit at PT. Wahyu Murti Garuda Kencana, Central Kalimantan. There is a water problem that interferes with production activities because the actual sump dimensions are insufficient to accommodate the daily discharge of water that enters the sump. So that the impact on the mining front is flooded or there is waterlogging that disrupts mining activities. The progress of the mine is directed towards the north of the sump so that the distance and dimensions of the actual sump are ineffective and unable to accommodate the incoming water discharge in accordance with the direction of the mine progress due to the mining location in the pit which is easily submerged by water. The drainage condition at PT. Wahyu Murti Garuda Kencana uses the mine dewatering method which is a method of removing water that flows into the mining sump using a pump. Theoretically, by conducting direct research on the sump area of PT. Wahyu Murti Garuda Kencana, the actual sump dimensions are insufficient to accommodate the water discharge that enters the pit. The design carried out pays attention to the mining plan so that the sump design to be designed can be applied in the field in accordance with the mine design. The shape of the sump designed is a trapezoidal shape with dimensions of 80 m x 70 m cross-section, 74 m x 64 m bottom section, depth of 4 m and 55 degree tilt angle and a total sump volume capacity of 20,672 m3.
Downloads
References
Alfida. Dkk. (2024). Perhitungan Kapasitas Sump Pit 4 PT RPP Contractors Indonesia Job Site PT Adimitra Baratama Nusantara Provinsi Kalimantan Timur. ISSN: 1907-5995.
Badan Meteorologi, Klimatologi, Dan Geofisika “Laporan iklim harian https://dataonline.bmkg.go.id/data-harian diakses pada 14 April 2024 pukul 08:40.
Endriantho, M., & Ramli. M et. Perencanaan Sistem Penyaliran Tambang Terbuka Batubara. Jurnal Geosains 9.01 (2013): 20-27.
Fanani, Y. Sasauw, R. (2021). Kajian Hidrologi Untuk Evaluasi Sump Dan Sistem Pemompan Di PT. Bhumi Rantau Energi Kabupaten Tapin Kalimantan Selatan. Vol. 3.
Hasianda, A.L. (2020). Rancangan Sump Di Pit Barani, Site Martabe Goldmine, PT. Agincourt Resources, Sumatera Utara, Jurnal Teknik Pertambangan .
Megasara, T. S. (2022). Analisis Mine Dewatering PT. Rimau Energi Mining BaritoTimur Kalimantan Tengah. Skripsi
Mahendra, D.D. (2018). Perencanaan Penyaliran Tambang Di Wilayah Kerja Pt. Kideco Jaya Agung, Kecamatan Batu Sopang, Kabupaten Paser, Kalimantan Timur. Skripsi.
Mudya, D. R., & Ms, M. (2018). Evaluasi Kebutuhan Pipa dan Pompa untukArea Pit Inul East Departemen Hatari PT. Kaltim Prima Coal Hingga Akhir Kuartal IV Tahun 2018. 4(1), 37–48.
Nugraha. K. V., & Isniarno. N. F. Analisis Hidrologi untuk Mendukung Rencana Penentuan Temporary Sump pada Tambang Emas. Volume 2, No. 1, Juli 2022.
Putra, J.H, Farid. F, Wiratama J. (2021). Rancangan Dimensi Sump berdasarkan Pertambahan Debit Air yang masuk dalam 3 Bulan Kemajuan Tambang di PT. Khatulistiwa Makmur Persada, Kabupaten Bungo. Jurnal Teknik Kebumian, Volume 7.
Rinaldi, A. (2012). Analisis Keputusan Hidrogeologi : Optimasi Sump pada Sistem Tambang TerbukaSembiring, Y. P. J., Paays, A., Waterman, S. B., & Fridtriyanda, A. (2018).
Sapan, Silvester. G., Cahyono. Y. D.G., & Fanani. Y. "Kajian Teknis Dimensi Sump Dan Kebutuhan Pompa Pada Penyaliran Tambang Terbuka Di Pit 1 PT. Senamas Energindo Mineral Kecamatan Jawetan, Kabupaten Barito timur, Provinsi Kalimantan Tengah." Prosiding Seminar Teknologi Kebumian Dan Kelautan (SEMITAN). Vol. 2. No. 1. 2020.
Sembiring,Y. P. J., Paays. A., Waterman. S. B., & Fridtriyanda. A., Sistem Penyaliran Tambang Pit 19d Untuk Yearly Plan 2012 PT. Indominco Mandiri Bontang Kalimantan Timur. 2018. ISSN: 1907-5995.
Siahaan, Rahmadi, Alam. P. N., & Mutia. F., "Evaluasi Teknis Sistem Penyaliran Tambang, Studi Kasus: PT. Bara Energi Lestari Kabupaten Nagan Raya, Aceh." Journal of Geosciences, Mining Engineering, and Technology 1.1 (2017): 30-37.
Sidauruk, K. (2024). Rancangan Dimensi Sump Di Pt. Satria Alam Manunggal Site Top Desa Buhut Jaya Kecamatan Kapuas Tengah Kabupaten Kapuas Kalimantan Tengah. Skripsi.
Sinaga, E.R. (2025). Analisis Sistem Dewatering Di PT. Mitra Barito Kecamatan Montallat Kabupaten Barito Utara Provinsi Kalimantan Tengah. Skripsi. https://doi.org/10.36873/jtp.v25i1.19415
Suwandhi, A. (2004). Perencanaan Sistem Penyaliran Tambang. Bandung: Universitas Islam Bandung. Vol : 09, No : 1, 2023
Syarifuddin, Syarifuddin, Sri Widodo, and Arif Nurwaskito. "Kajian Sistem Penyaliran pada Tambang Terbuka Kabupaten Tanah Bumbu Provinsi Kalimantan Selatan." Jurnal Geomine 5.2 (2017): 84-89. https://doi.org/10.33536/jg.v5i2.132
Umar., Prasetyawati. E., "Penanganan Air Limpasan pada Lokasi Penambangan Batubara PT Argo On Star Provinsi Kalimantan Selatan." Jurnal Geomine 8.3 (2020): 247-252. https://doi.org/10.33536/jg.v8i3.597
Vinsensius, Y. T. (2019). Analisis Sistem Pemompaan Pada PT. Riung Mitra Lestari Kutai Kartanegara Kalimantan Timur. Skripsi.
Wijaya, A.E, dkk. (2024). Perhitungan Debit Air Total Sump Di Pit 23 Cv Bunda Kandung. jurnal Teknik Pertambangan. Vol : 24, No : 1, Februari 2024, Halaman 31 - 35. https://doi.org/10.36873/jtp.v24i1.12374
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 JURAL RISET RUMPUN ILMU TEKNIK

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
_001.jpg)