Evaluasi Kinerja Simpang Tak Bersinyal Dengan Pulau Lalu Lintas di Kota Pontianak

Studi Kasus : Persimpangan Jl. Tebu-Jl. Tabrani Ahmad

Authors

  • Muhammad Dzulfikar Andika Satriatama Universitas Tanjungpura
  • Elsa Tri Mukti Universitas Tanjungpura
  • S. Nurlaily Kadarini Universitas Tanjungpura

DOI:

https://doi.org/10.55606/jurritek.v4i3.6546

Keywords:

degree of saturation, intersection performance, PKJI 2023, PTV VISSIM, traffic flow management

Abstract

The increase in traffic volume in urban areas often triggers various problems, especially at Road intersection points that have a high level of interaction between vehicles. One of the locations that experience these problems is the intersection with the island of traffic without signal on Jl. Tebu-Jl. Tabrani Ahmad, City Of Pontianak. This study aims to analyze the performance of the intersection in the existing condition and project its performance in the next five years (2030), as well as formulate alternative treatment that can improve the smoothness of traffic. The analysis method refers to Indonesian road capacity guidelines (PKJI) 2023 and modeling using software PTV VISSIM. The data collected include intersection geometry, traffic volume, and vehicle speed. Traffic volumes were obtained through CCTV recordings for three consecutive days, then processed and presented in the form of tables and graphs for easy interpretation. The results of the existing condition analysis showed that the degree of saturation (DS) reached 0.407 with an average delay of 9.539 seconds (Level of Service/LOS B) based on PKJI, while VISSIM simulation resulted in a delay of 12.54 seconds (LOS B). The five-year projection (2030) shows an increase in DS to 0.878 with a delay of 15.177 seconds (LOS C) from PKJI, and 23.35 seconds (LOS C) from VISSIM, which indicates a decrease in Junction performance as traffic grows. Two handling alternatives were analyzed, namely the construction of roundabouts and the implementation of traffic flow management. VISSIM simulation shows that the roundabout can reduce the delay to 14.31 seconds with a queue length of 20.34 m (LOS B), while the flow management produces a delay of 11.81 seconds with a queue of 13.14 m (LOS B). This result confirms that both alternatives are able to improve the performance of the intersection compared to the projected condition without handling, so that it can be a technical recommendation for urban traffic planning in Pontianak.

Downloads

Download data is not yet available.

References

Alamsyah, A. A. (2008). Rekayasa lalu lintas (Edisi revisi). UPT Penerbitan Universitas Muhammadiyah Malang.

Apriawal, H. A. (2019). Evaluasi kinerja simpang tiga tak bersinyal di Kota Makassar (Tugas akhir, Program Studi Teknik Sipil, Fakultas Teknik, Universitas Bosowa, Makassar).

Badan Pendapatan Daerah (Bappenda) Provinsi Kalimantan Barat. (2024).

Dinas Kependudukan dan Pencatatan Sipil Kota Pontianak. (2024).

Dinata, W. A., & Erwan, K. (2017). Analisis kinerja simpang tiga pada Jalan Komyos Sudarso–Jalan Umuthalib Kota Pontianak. JeLAST: Jurnal Teknik Kelautan, PWK, Sipil dan Tambang.

Direktorat Jenderal Bina Marga. (2023). Pedoman kapasitas jalan Indonesia. Badan Penerbit Pekerjaan Umum.

Harahap, T. A. A., Kadarini, S. N., & Sumiyattinah, S. (2022). Evaluasi simpang tiga tak bersinyal pada simpang Jl. Reformasi–Jl. Sepakat 2 dan simpang Jl. Sepakat 2–Jl. Padat Karya menggunakan MKJI 1997 dan software VISSIM student version 2022 SP 09. JeLAST: Jurnal Teknik Kelautan, PWK, Sipil dan Tambang.

Hariman, A. F., Misdalena, F., & Aprilyanti, S. (2025). Evaluasi kinerja ruas Jalan Sukabangun II Kota Palembang menggunakan metode PKJI 2023. Media Ilmiah Teknik Sipil, 13(1), 26–33.

Juwita, F. (2021). Evaluasi kinerja simpang tak bersinyal menggunakan PTV VISSIM 9.0 (Studi kasus Jalan AH Nasution – Jalan Way Pangabuan – Jalan Tanggamus) (Tugas akhir, Program Studi Teknik Sipil, Fakultas Teknik, Universitas …).

Khisty, C. J., & Lall, B. K. (2005). Dasar-dasar rekayasa transportasi.

Maskha, R. A., Azwansyah, H., & Kadarini, S. N. (2020). Pengaturan lalu lintas simpang empat dengan median jalan menggunakan program VISSIM. JeLAST: Jurnal Teknik Kelautan, PWK, Sipil dan Tambang.

Morlok, E. K. (2014). Pengantar teknik dan perencanaan transportasi.

Ningsih, T. W., Said, & Sumiyattinah. (2022). Analisis kinerja simpang dan model simulasi lalu lintas simpang tak bersinyal menggunakan software VISSIM (Studi kasus: Persimpangan Jl. Komodor Yos Sudarso – Jl. RE Martadinata Kota Pontianak). JeLAST: Jurnal Teknik Kelautan, PWK, Sipil dan Tambang.

Parhadi, P., Syafarudin, A., & Azwansyah, H. (n.d.). Evaluasi kinerja dan alternatif penanganan simpang pada Jalan Ya'm Sabran – Jalan Panglima Aim Kota Pontianak. JeLAST: Jurnal PWK, Laut, Sipil, Tambang.

Peraturan Menteri Perhubungan Republik Indonesia Nomor PM 96 Tahun 2015. (2015). Pedoman pelaksanaan kegiatan manajemen dan rekayasa lalu lintas. Menteri Perhubungan Republik Indonesia.

Downloads

Published

2025-09-02

How to Cite

Muhammad Dzulfikar Andika Satriatama, Elsa Tri Mukti, & S. Nurlaily Kadarini. (2025). Evaluasi Kinerja Simpang Tak Bersinyal Dengan Pulau Lalu Lintas di Kota Pontianak: Studi Kasus : Persimpangan Jl. Tebu-Jl. Tabrani Ahmad. JURAL RISET RUMPUN ILMU TEKNIK, 4(3), 158–170. https://doi.org/10.55606/jurritek.v4i3.6546

Similar Articles

<< < 2 3 4 5 6 7 8 9 10 11 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)