Pelaksanaan Show Case Meeting (SCM) pada Proyek Preservasi Jalan Girian – Kema – Rumbia – Buyat 2024

Authors

  • Andi Martalata Program Profesi Insinyur, Program Pascasarjana Universitas Sam Ratulangi, Manado
  • Arthur Harris Thambas Program Profesi Insinyur, Program Pascasarjana Universitas Sam Ratulangi, Manado
  • Tiny Mananoma Program Profesi Insinyur, Program Pascasarjana Universitas Sam Ratulangi, Manado

DOI:

https://doi.org/10.55606/jurritek.v5i1.7554

Keywords:

Contract Control, Contract Performance Delay, Critical Contract, Road Preservation Project, Show Case Meeting

Abstract

Road preservation is a type of maintenance that keeps roads in satisfactory working order by using preventive, corrective, rehabilitation, and reconstruction methods. This approach makes sure that the road stays usable for the entire time it is planned to be used. In practice, preservation projects often run into delays that can lead to important contract conditions. To avoid this, there needs to be a structured way to evaluate things through a Show Case Meeting (SCM). This study looks at how SCM was used in the 2024 Girian–Kema–Rumbia–Buyat Road Preservation Project to find out what caused the delays and how well the agreed-upon fixes worked. The method included looking at physical progress, differences between planned and actual performance, and how well the contractor did during SCM Stages I and II. The results indicate that the contractor failed to provide enough workers and move the right equipment, which led to the critical contract condition. SCM Stage I did not meet the required test-case target, but SCM Stage II did, showing that the contractor was able to meet the required performance targets and finish the work on time. These results show that SCM is an important way to control contracts and fix problems, which helps construction projects get done on time and well.

Downloads

Download data is not yet available.

References

Ardiansyah, D., & Nurhadi, M. (2014). Studi keterlambatan penyelesaian proyek konstruksi jalan beton di Kota Pontianak. Jurnal Teknik Sipil Universitas Tanjungpura, 14(2), 1–10.

Dipohusodo, I. (1996). Manajemen proyek & konstruksi. Yogyakarta: Kanisius.

Direktorat Jenderal Bina Marga. (2022). SOP/UPM/DJBM-110 Rev:01 tentang Prosedur Pelaksanaan Show Case Meeting (SCM). Jakarta: Kementerian Pekerjaan Umum dan Perumahan Rakyat.

Kementerian Pekerjaan Umum. (2011). Peraturan Menteri Pekerjaan Umum Nomor 13/PRT/M/2011 tentang Tata Cara Pemeliharaan dan Penilikan Jalan. Jakarta: Kementerian Pekerjaan Umum.

Lapadengan, T., & Mandagi, M. J. (2023). Metode pelaksanaan pekerjaan preservasi jalan. Jurnal Teknik Sipil Universitas Sam Ratulangi, 12(1), 45–52.

Lasmini, T. (2024). Buku Panduan Pelaksanaan Administrasi Pembangunan Konstruksi di Kota Bandung. Bandung: Bagian Administrasi Pembangunan Kota Bandung.

Lombogia, R., Dundu, A. K., & Malingkas, G. Y. (2024). Metode Pelaksanaan Pekerjaan Preservasi Jalan Ruas Kaiya-Kotamobagu. TEKNO, 22(87), 85-92.

Messah, Y. A., & Suhendra, A. (2013). Kajian penyebab keterlambatan pelaksanaan proyek konstruksi gedung di Kota Kupang. Jurnal Teknik Sipil, 2(1), 33–42.

Naseer, A., Qureshi, S., & Shaukat, M. (2020). A study on causes of delay in road construction projects. International Journal of Construction Management.

Putra, M. (2021). Show Case Meeting (SCM) jasa konstruksi. Jakarta: Penerbit Teknik Konstruksi.

Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in construction projects: A systematic review. International Journal of Project Management, 25(5), 517-526. https://doi.org/10.1016/j.ijproman.2006.11.007

Setyawan, A., & Mulyono, A. T. (2016). The challenges of road preservation program for Indonesian national roadway. Proceedings of the International Conference on Engineering Technology, 1-8. https://doi.org/10.4028/www.scientific.net/AMM.845.359

Soeharto, I. (1995). Manajemen proyek: Dari konseptual sampai operasional. Jakarta: Erlangga.

Sudiro, H., Ophiyandri, T., & Hidayat, B. (2026). Pengaruh implementasi Show Cause Meeting pada proyek jalan dan jembatan Provinsi Sumatera Barat. Menara: Jurnal Teknik Sipil, 21(1), 21-28. https://doi.org/10.21009/jmenara.v21i1.55303

Wahyudi, R., & Indra Yono, C. (2006). Pengaruh keterlambatan proyek terhadap pembengkakan biaya proyek. Surabaya: Universitas Kristen Petra.

Downloads

Published

2026-01-03

How to Cite

Martalata, A., Thambas, A. H., & Mananoma, T. (2026). Pelaksanaan Show Case Meeting (SCM) pada Proyek Preservasi Jalan Girian – Kema – Rumbia – Buyat 2024. JURAL RISET RUMPUN ILMU TEKNIK, 5(1), 366–376. https://doi.org/10.55606/jurritek.v5i1.7554

Similar Articles

<< < 10 11 12 13 14 15 16 17 18 19 > >> 

You may also start an advanced similarity search for this article.