Perancangan Dimensi Sump di PT. Satria Alam Manunggal Site Telen Orbit Prima Desa Buhut Kecamatan Kapuas Tengah Kabupaten Kapuas Kalimantan Tengah

Authors

  • Sri Rahmawati Universitas Palangka Raya
  • Noveriady Noveriady Universitas Palangka Raya
  • Yunida Iasahnia Universitas Palangka Raya
  • Neny Fidayanti Universitas Palangka Raya
  • Asri Fridtriyanda Universitas Palangka Raya

DOI:

https://doi.org/10.55606/jurritek.v5i1.7399

Keywords:

Design Rainfall, Drainage System, Mine Sump, Pump Capacity, TSS

Abstract

This study aims to evaluate the actual sump capacity in accommodating mine water discharge, design a sump that fits field conditions, and determine the optimal pump capacity and system at PT Satria Alam Manunggal, Telen Orbit Prima Site. The research methods include field data collection (sump condition, water discharge, and pump capacity) and supporting data (rainfall, geological maps, and pump specifications). The design rainfall was calculated using the Gumbel method with a five-year return period, while water discharge was estimated from runoff, rainfall, and groundwater inflow. The results indicate that the existing sump, with a capacity of 508 m³, is insufficient to accommodate an inflow of 1.210 m³/s. Therefore, two new sumps were designed: the West Sump with a capacity of 38,400 m³ and the East Sump with 78,281 m³. Each sump employs a DnD 150-4H pump with a discharge rate of 480 m³/hour. The West Sump pump can drain water within approximately three days, while the East Sump requires about seven days. The trapezoidal sump design was chosen for its efficiency, structural stability, and effectiveness in sediment (TSS) deposition control, maintaining levels within safe limits. In conclusion, the design of the West and East sumps is considered optimal in accommodating mine water discharge and improving the overall effectiveness of the mine drainage system.

Downloads

Download data is not yet available.

References

Adnyano, A. I. A., & Bagaskoro, M. (2020). Kajian teknis dewatering system tambang pada pertambangan batubara. Jurnal Promine, 8(1), 28–33. https://doi.org/10.33019/promine.v8i1.1794

Armelia, Y., Asyik, M., & Wijaya, M. (2020). Perencanaan ulang dimensi sump dan pompa pada Sump A di PT. Buana Eltra. Jurnal Pertambangan, 4(2), 114–120. https://doi.org/10.36706/jp.v4i2.464

Gautama, R. S. (1999). Sistem penyaliran tambang. Institut Teknologi Bandung.

Gómez, R., Ayala, C., & Vázquez, C. (2022). Hydrogeological factors affecting mine dewatering efficiency: A case study in an open pit mine. Journal of Environmental & Mining Engineering, 10(2), 45–59.

Hartman, H. L., & Mutmansky, J. M. (2002). Introductory mining engineering (2nd ed.). John Wiley & Sons.

Linsley, R. K., Kohler, M. A., & Paulhus, J. L. H. (1975). Hydrology for engineers (2nd ed.). McGraw-Hill.

Murad, M. S. (2021). Rancangan sump dan sediment pond Bukit 13 PT. Antam Tbk UBP Bauksit Tayan Kalimantan Barat. Jurnal Sains dan Teknologi Keilmuan dan Aplikasi Teknologi Industri. https://doi.org/10.36275/stsp.v21i2.386

Skousen, J., & Zipper, C. (2019). Acid mine drainage control and treatment. In P. Younger (Ed.), Handbook of mine drainage and flood control. Springer.

Soemarto, C. D. (1999). Hidrologi teknik. Penerbit Erlangga.

Soemarto, C. D. (1999). Statistik terapan untuk teknik dan sains. Penerbit Andi.

Sularso, & Tahara, H. (1987). Pompa dan kompresor. Pradnya Paramita.

Triatmodjo, B. (2008). Applied hydrology. Beta Offset.

Virgiyanti, L., Wijaya, E. E., & Indrajaya, F. (2024). Perhitungan debit air total sump di Pit 23 CV Bunda Kandung: Calculation of total sump water discharge at Pit 23 CV Bunda Kandung. Jurnal Teknik Pertambangan, 24(1), 31–35. https://doi.org/10.36873/jtp.v24i1.12374

Wibowo, Y. G., Zahar, W., & Maryani, A. T. (2018). Studi kasus perencanaan pompa pada tambang terbuka Pit Donggang Utara Blok 32, PT Buana Bara Ekapratama. Jurnal Sains & Teknologi Lingkungan, 10(2), 115–124. https://doi.org/10.20885/jstl.vol10.iss2.art4

Wilson, S. A., Hayes, P. J., & Sexton, M. (2018). Surface water management in surface mines: Design and implementation of pit dewatering systems. International Journal of Mining, Reclamation and Environment, 32(5), 317–332. https://doi.org/10.1080/17480930.2018.1477772

Younger, P. L. (2001). Mine water hydrology and geochemistry. Blackie Academic & Professional.

Downloads

Published

2026-01-03

How to Cite

Sri Rahmawati, Noveriady Noveriady, Yunida Iasahnia, Neny Fidayanti, & Asri Fridtriyanda. (2026). Perancangan Dimensi Sump di PT. Satria Alam Manunggal Site Telen Orbit Prima Desa Buhut Kecamatan Kapuas Tengah Kabupaten Kapuas Kalimantan Tengah. JURAL RISET RUMPUN ILMU TEKNIK, 5(1), 139–153. https://doi.org/10.55606/jurritek.v5i1.7399

Similar Articles

<< < 5 6 7 8 9 10 11 12 13 14 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)