Perancangan Sequence Penambangan Bulan Januari dan Februari Tahun 2025 pada PT Putra Perkasa Abadi Site SKS

Authors

  • Eka Taufiqur Rahman Universitas Palangka Raya
  • Deddy Nan Setya Putra Tanggara Universitas Palangka Raya
  • Ferdinandus Ferdinandus Universitas Palangka Raya
  • Noveriady Noveriady Universitas Palangka Raya
  • I Putu Putrawiyanta Universitas Palangka Raya

DOI:

https://doi.org/10.55606/jurritek.v5i1.7076

Keywords:

Coal, Operational Efficiency, Overburden, Production, Sequence Plan

Abstract

Mining sequence design is one of the important stages in open pit mining activities that aims to organize the excavation stages so that production activities run effectively, efficiently, and in accordance with the established targets. This research was conducted at PT Putra Perkasa Abadi Site SKS with the aim of designing a mining sequence in January and February 2025. The methods used include analysis of topographic data, geology, pit design, and monthly production targets. The data was processed using mining software to determine the excavation sequence based on elevation, overburden volume, and coal reserves. The design results show that the total planned overburden and coal volume is able to meet the company's production targets by considering slope stability and the efficiency of digging and loading equipment. In addition, the resulting sequence design also takes into account aspects of work safety and field operational conditions, such as mine road access and drainage systems. With a structured design, it is expected that mining activities during this period can run according to schedule, minimize operational obstacles, and support the achievement of production targets and cost efficiency at PT Putra Perkasa Abadi Site SKS.

Downloads

Download data is not yet available.

References

Adiwarman, M., Cahyadi, R., Yusuf, Y., & Isnaeni, K. M. A. (2024). Pemodelan desain pit pada bulan Juni 2023 dengan menggunakan software Minescape 5.7 di PT Cahaya Riau Mandiri site Duta Alam Sumatra, Kabupaten Lahat, Provinsi Sumatra Selatan. Jurnal Ilmiah Teknik dan Sains, 1(3), 167–172. https://doi.org/10.62278/jits.v1i3.28

Alfiyanda, A., Nugroho, W., Magdalena, H., Hasan, H., & Respati, L. L. (2023). Perancangan triwulan sequence penambangan batubara pada PIT 5F PT Wijaya Mandiri Energi. Jurnal Sosial Teknologi, 3(12), 978–982. https://doi.org/10.59188/jurnalsostech.v3i12.1019

Anshari, E. (2023). Rancangan sequence penambangan pada blok A4 PT Adhi Kartiko Pratama Desa Lameruru Kecamatan Langgikima Kabupaten Konawe Utara Provinsi Sulawesi Tenggara. Jurnal Locus Penelitian dan Pengabdian, 2(12), 1163–1180. https://doi.org/10.58344/locus.v2i12.2336

Bakhtiar, R. A. (2019). Rancangan teknis penambangan batubara di Pit Tambang Air Laya Timur PT Bukit Asam Tbk Tanjung Enim Sumatera Selatan [Disertasi doktor, Institut Teknologi Sains Bandung].

Baskara, A. A. (2021). Rancangan teknis kemajuan penambangan batubara untuk memenuhi target produksi per tahun pada Pit C di PT Alfa Riung Jaya, Tanah Laut, Kalimantan Selatan [Skripsi sarjana, Universitas Pembangunan Nasional “Veteran” Yogyakarta].

Habibie Anwar, R. E. (2023). Rancangan penambangan jangka pendek pada Pit Utara di PT Tubindo Kabupaten Bulungan Provinsi Kalimantan Utara. Jurnal Geomine, 11(1), 102–110.

Hardianti, S., Pratama, D., Adiwarman, M., & Aprilliana, A. (2024). Perencanaan desain pit Banko Selatan PT Bukit Asam, Tbk, Provinsi Sumatera Selatan. Jurnal Teknik Patra Akademika, 15(1), 27–33. https://doi.org/10.52506/jtpa.v15i01.240

Khairul, A. (2021, December). Perancangan tambang (pit design) dan pentahapan tambang batubara pit blok 3 dengan stripping ratio 7:1 di PT XYZ, Desa Lubuk Sini, Kecamatan Taba Penanjung, Kabupaten Bengkulu Tengah, Provinsi Bengkulu. Bandung Conference Series: Mining Engineering, 1(1), 1–7. https://doi.org/10.29313/bcsme.v1i1.68

Mandew, P., Putra, H. J., Habrianto, R., & Hardianto, Z. (2021). Perancangan sequence penambangan batubara di Pit Tutupan Selatan area Mitsubishi, PT Pamapersada Nusantara jobsite PT Adaro Indonesia, Kalimantan Selatan. Jurnal Indonesia Sosial Teknologi, 2(3), 427–442. https://doi.org/10.36418/jist.v2i3.96

Martadinata, M. A. J., & Sepriadi, S. (2019). Pemodelan desain pit dan sequence penambangan batubara untuk memenuhi target produksi dengan menggunakan software Minescape 4.119 di PT Bukit Asam, Tbk, Tanjung Enim, Sumatera Selatan. Jurnal Teknik Patra Akademika, 10(2), 76–85. https://doi.org/10.52506/jtpa.v10i02.96

Muhammad Dwi Nanda, Yuliadi, & Zaenal. (2021). Kajian geometri jalan angkut tambang berdasarkan AASHTO dan Kepmen No. 1827/K/30/Mem/2018 pada penambangan andesit di PT XYZ, Kecamatan Rumpin, Kabupaten Bogor, Provinsi Jawa Barat. Jurnal Riset Teknik Pertambangan, 1(2), 107–116. https://doi.org/10.29313/jrtp.v1i2.403

Negara, I. G. N., & Hutapea, R. O. (2020). Pushback design block X at PT Ifishdeco Southeast Sulawesi: Desain pushback blok X pada PT Ifishdeco Sulawesi Tenggara. INTAN Jurnal Penelitian Tambang, 3(2), 154–160. https://doi.org/10.56139/intan.v3i2.70

Peter Mandew, H. J. (2021). Perancangan sequence penambangan batubara di Pit Tutupan Selatan area Mitsubishi, PT Pamapersada Nusantara jobsite PT Adaro Indonesia, Kalimantan Selatan. Jurnal Indonesia Sosial Teknologi, 2(3), 427–441. https://doi.org/10.36418/jist.v2i3.96

Prambahan, P., Marliantoni, M., & Desmawita, D. (2020). Rancangan sequence penambangan batubara untuk memenuhi target produksi batubara PT Barasentosa Lestari site Belani Provinsi Sumatera Selatan. Jurnal Mine Magazine, 1(2). https://doi.org/10.20527/jhs.v3i01.952

Pratama, R. A., Saismana, U., Riswan, R., & Irawan, H. (2019). Perencanaan sequence bulanan tambang batubara di PT Batubara Kalimantan. Jurnal Himasapta, 3(1).

Romualdo Nadeak. (2024). Rancangan sequence penambangan untuk memenuhi target produksi bulanan PT Satria Alam Manunggal site TOPB, Kecamatan Kapuas Tengah, Kabupaten Kapuas, Provinsi Kalimantan Tengah.

Sanga-Sanga, P. A. B. N. (2020). Short term plan Pit 1 PT RPP Contractors Indonesia job site PT Adimitra Baratama Nusantara, Kecamatan Sanga-Sanga, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur. Jurnal Teknologi Mineral FT UNMUL, 8(2), 20–25.

Saputra, D., Asof, M., & DH, E. W. (2014). Rancangan teknis penambangan batubara di blok selatan PT Dizamatra Powerindo, Lahat, Sumatera Selatan. Jurnal Ilmu Teknik, 2(3).

Syahputra, F. D., Devy, S. D., & Magdalena, H. (2024). Rencana tahapan penambangan batubara pada tambang terbuka di Pit Selatan PT RPP Contractor Indonesia, Kecamatan Loa Janan, Kabupaten Kutai Kartanegara, Kalimantan Timur. Jurnal Penelitian Rumpun Ilmu Teknik, 3(3), 1–9. https://doi.org/10.55606/juprit.v3i3.4051

Tiara Pratiwi, F. F. (2022). Rancangan sequence penambangan batubara pada Pit Barat periode triwulan III tahun 2018 di PT Dizamatra Powerindo, Kabupaten Lahat, Provinsi Sumatera Utara. Jurnal Teknik Kebumian, 6(2), 26–35.

Downloads

Published

2026-01-03

How to Cite

Eka Taufiqur Rahman, Deddy Nan Setya Putra Tanggara, Ferdinandus Ferdinandus, Noveriady Noveriady, & I Putu Putrawiyanta. (2026). Perancangan Sequence Penambangan Bulan Januari dan Februari Tahun 2025 pada PT Putra Perkasa Abadi Site SKS. JURAL RISET RUMPUN ILMU TEKNIK, 5(1), 09–23. https://doi.org/10.55606/jurritek.v5i1.7076

Similar Articles

<< < 9 10 11 12 13 14 

You may also start an advanced similarity search for this article.