Analisis Peranan Handling Cargo Terhadap Proses Bongkar Muat di PT. Terminal Teluk Lamong
DOI:
https://doi.org/10.55606/jurritek.v4i1.5019Keywords:
Cargo Handling, Loading and Unloading,, Mixed Methods, Port Efficiency, PT Terminal Teluk LamongAbstract
The role of Cargo Handling on the Loading and Unloading Process at PT Terminal Teluk Lamong is very important for the loading and unloading process at the port. This research aims to identify various technical and non technical obstacles in the operation of cargo handling equipment such as ASC, forklift, and reach stacker. The interview results showed that there are four main factors that become obstacles in the loading and unloading process, namely machines, methods, facilities, and manpower. Further analysis using fishbone diagrams reinforced these findings by outlining the causes of each factor, ranging from machine interference, wrong container placement methods, limited technological facilities such as Container Scanner Reader (CSR), to the driver’s lack of understanding of the automation system. Quantitatively, the efficiency of cargo handling was evaluated through the 2023 container throughput, which showed a positive trend with a significant increase in load activity, especially in October which recorded the highest number of 39.106 Boxes. The analysis concluded that although there are various obstacles in cargo handling practices, the system implemented by PT Terminal Teluk Lamong has generally been able to improve the efficiency of the loading and unloading process, as evidenced by the volume of container handling.
Downloads
References
Azizah, R. N., Ahmad, S., Fenanlampir, D. R., Junior, P., & Manalu, S. (2024, October). Peran teknologi dalam meningkatkan kinerja.
Fitriyah, P. N. (2019). Pengaruh lead time dan handling cargo terhadap proses pengiriman barang di PT. XYZ.
Hendrawati. (2017). Pengaruh lead time dan handling cargo terhadap kualitas pengiriman barang di PT. XYZ. Jurnal Akuntansi, 11, 5–22.
Katili, A. R., Kemaritiman, J., & Samarinda, P. N. (2024). Analisis cargo handling and safety dalam pengaturan muatan pada MV. Intan Daya 88. 14(1), 18–22.
Safira, S., Satrio, B. R. D., Wildiansah, M., Andini, R. A., & Sahara, S. (2023). Analisis pengaruh dwelling time terhadap efisiensi bongkar muat di Pelabuhan Tanjung Priok. MIMBAR ADMINISTRASI FISIP UNTAG Semarang, 20(1), 71–84. https://doi.org/10.56444/mia.v20i1.656
Sarah, F. (2018). Risk analysis of Automated Stacking Crane (ASC) Terminal Teluk Lamong using FMECA method based on ISO 31000:2009. 3(2).
Sasono, H. B. (2021). Manajemen pelabuhan dan realisasi ekspor impor. Penerbit Andi.
Silalahi, E. K. (2016). Automatic stacking crane di PT. Terminal Teluk Lamong Pelindo III.
Somantri, G. R. (2005). Memahami metode kualitatif. Makara Human Behavior Studies in Asia, 9(2), 57. https://doi.org/10.7454/mssh.v9i2.122
Sugiyono. (2015). Metode kuantitatif, kualitatif, dan R&D.
Suyono, R. P. (2005). Shipping: Pengangkutan intermodal ekspor impor melalui laut. Penerbit PPM.
Triatmodjo, B. (2009). Perencanaan pelabuhan. Beta Offset.
Vernoval, G., Jokosisworo, S., & Adietya, B. A. (2019). Analisis risiko pada proses bongkar muat dengan metode Analytical Hierarchy Process (AHP) dan Fault Tree Analysis (FTA) di PT. Abadi Jaya Maritim. Jurnal Teknik Perkapalan, 7(2), 152–160.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 JURAL RISET RUMPUN ILMU TEKNIK

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
_001.jpg)




