Evaluasi Pemborosan (7 Waste) dalam Proses Produksi PT XYZ dan Penerapan Lean Manufacturing 5S dan PDCA sebagai Solusi dalam Mengurangi Pemborosan
DOI:
https://doi.org/10.55606/jurritek.v4i1.4996Keywords:
5S, lean-manufacturing, PDCA, production-waste, process-improvementAbstract
This study aims to evaluate production waste at PT XYZ, a food manufacturing company in Bandung, Indonesia, which experiences inefficiencies caused by overproduction and product defects. A descriptive qualitative method with a case study approach was used, employing data from production reports, field observations, and interviews. The analysis was conducted using the 7 Waste framework, the 5S workplace organization method, and the PDCA (Plan-Do-Check-Act) cycle. The findings show that the main types of waste at PT XYZ are overproduction and defects, which are caused by inaccurate demand forecasting, ineffective layout, and inconsistent quality control. By implementing 5S and PDCA, the company successfully reduced waste, improved workspace organization, and increased process efficiency. This study provides practical insights for manufacturing companies seeking to implement lean strategies for continuous improvement.
Downloads
References
Davim, J. P. (2018). Progress in Lean Manufacturing (First Edition). Springer International Publishing.
Fitra, P. A., Suryadhini, P. P., & Prasetio, M. D. (2023). Usulan Penerapan Aktivitas 5S Untuk Mengurangi Waste Motion Pada Proses Produksi Kelambu Tidur di PT. XYZ dengan Pendekatan Lean Manufacturing. eProceedings of Engineering, 10(2).
Fitriani, F. I. T. R. I. A. N. I. (2018). Siklus Pdca Dan Filosofi Kaizen. Adaara: Jurnal Manajemen Pendidikan Islam, 7(1), 625-640.
Gorenflo, G. dan Moran, J.W. (2009). The ABCs of PDCA. Minnesota: Accreditation Coalition.
Liker, J. K. (2021). The Toyota Way: 14 Management Principles from The World’s Greatest Manufacturer (2nd ed.). McGraw-Hill.
Martin, D. (2021). Lean Manufacturing: A Beginner's Guide. Quality Progress, 54(3), 36-42.
Martin, J. W. (2021). Lean Six Sigma for the Office: Integrating Customer Experience for Enhanced Productivity (Second Edition). Routledge.
Morey, J. (2020). 5S Method and its Implementation in Company. International Research Journal of Engineering and Technology, 7(2), 892-895.
Ohno, T. (2019). Toyota production system: beyond large-scale production. Productivity press.
Ortiz, C. A., & Park, M. R. (2011). Visual controls: Applying Visual Management to the Factory. Productivity Press.
Rahman, Natasya Mazida., Prabaswari, Atyanti Dyah., Nofita, Sinta. (2020). Identifikasi Waste Pada Lini Produksi 220ml dan 330ml dengan Pendekatan Lean Manufacturing pada Perusahaan XYZ. IENACO (Industrial Engineering National Conference) 8 2020
Rother, M., & Shook, J. (2003). Learning to See: Value Stream Mapping to Add Value and Eliminate MUDA. Lean Enterprise Institute.
Syafrudin, M., et al. (2021). “Integration of Lean Manufacturing and Industry 4.0 Technologies in the Manufacturing Industry: A Systematic Literature Review.” Journal of Cleaner Production, 287, 125137.
Tortorella, G. L., et al. (2020). “Lean Manufacturing Implementation: Leadership Styles and Organizational Culture.” Total Quality Management & Business Excellence, 31(7-8), 755–773.
Womack, J. P., & Jones, D. T. (1996). Lean Thinking: Banish Waste and Create Wealth in Your Corporation. Free Press.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 JURAL RISET RUMPUN ILMU TEKNIK

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
_001.jpg)




